Inspections for the day of: Wednesday, August 29, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-03286 Permanent Service8/29/20188/29/20188/29/2018 2:42:43 PMPPASS
Phone #: ###-#### Inspection requested via web by Mike R. Rossknecht...reconnecting new mast and meterbase...

p/s o/h reconnect ok
ELE18-03000 Electrical Rough-In8/28/20188/29/20188/29/2018 1:51:28 PMPPASS
underground inspection...feed from ground mount...etc....underground from ground mount and ground rod ok
ELE18-03082 Conference8/29/20188/29/20188/29/2018 12:42:56 PMPPASS
discuss service change...went over material and job scope
ELE18-02552 Final8/29/20188/29/20188/29/2018 11:07:26 AMAFAIL
code 7920 Phone #: ###-#### Inspection requested via web by Neal Rumsey....

1..panel screws missing-110.12, 110.3
2..A/C whip needs strapps installed
3..breaker for hot tub needs installed for verification-110.3
4..mst bath exhaust fan shall have GFCI protection-in foot print of shower-210.8,110.3
5..no power in upstairs bedroom..missing outlet-110.7
6..hall lights-boxes recessed more then 1/4"
box extensions or spark rings needed
ELE18-03092 Final8/28/20188/29/20188/29/2018 9:55:14 AMAPASS
Phone #: ###-#### Inspection requested via web by BRS Permitting....labelling, disconnect, and OCPD ok to final
ELE18-03095 Electrical Rough-In8/28/20188/29/20188/29/2018 9:22:11 AMAPASS
Chad Van Orden is contact ###-####476 Phone #: ###-#### Inspection requested via web by Debby Pierce...wall cover ok...new exits cut in to existing ceiling...fixtures and tiles in front entry and cubicle area existing-new ceiling will be in 4 offices, breakroom, and storage rm
ELE18-03305 Permanent Service8/28/20188/29/20188/29/2018 8:39:27 AMANR
inspect the house meter to be re-energized Phone #: ###-#### Inspection requested via web by Brad Baker...meter pack needs labelled and house panel circuits
ELE18-03271 Electrical Rough-In8/27/20188/29/20188/29/2018 8:20:59 AMAPASS
Ufer inspection. Ufer will be installed Tuesday Afternoon, and the concrete pour will be on Wednesday Afternoon. Please call John ###-####. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer...ok to cover
ELE18-02523 Electrical Rough-In8/29/20188/29/20188/29/2018 7:50:39 AMAPASS
underground....west side branch homeruns...ok to cover
ELE18-02703 Electrical Rough-In8/28/20188/29/20188/28/2018 2:10:52 PMAPASS
Early as possible please -Crew needs to be off site by 10:00 am. Phone #: ###-#### Inspection requested via web by Laurie Hoelscher...rooftop work verified by pictures-junctions for new pillar lights, blanking off light boxes at signage...boxes installed with blanks on pillar light locations
ELE16-00560 Final8/28/20188/29/20188/28/2018 1:46:59 PMAPASS
Phone #: ###-#### Inspection requested via web by Stacie Tasker...closing permit...was for temp pole only...inspections called in on wrong permit...job is completed
ELE18-03000 Electrical Rough-In8/24/20188/29/20188/28/2018 10:31:19 AMACANC
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes