ELE18-03286
| Permanent Service | 8/29/2018 | 8/29/2018 | 8/29/2018 2:42:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mike R. Rossknecht...reconnecting new mast and meterbase...
p/s o/h reconnect ok
|
ELE18-03000
| Electrical Rough-In | 8/28/2018 | 8/29/2018 | 8/29/2018 1:51:28 PM | P | PASS |
|
|
underground inspection...feed from ground mount...etc....underground from ground mount and ground rod ok
|
ELE18-03082
| Conference | 8/29/2018 | 8/29/2018 | 8/29/2018 12:42:56 PM | P | PASS |
|
|
discuss service change...went over material and job scope
|
ELE18-02552
| Final | 8/29/2018 | 8/29/2018 | 8/29/2018 11:07:26 AM | A | FAIL |
|
|
code 7920 Phone #: ###-#### Inspection requested via web by Neal Rumsey....
1..panel screws missing-110.12, 110.3 2..A/C whip needs strapps installed 3..breaker for hot tub needs installed for verification-110.3 4..mst bath exhaust fan shall have GFCI protection-in foot print of shower-210.8,110.3 5..no power in upstairs bedroom..missing outlet-110.7 6..hall lights-boxes recessed more then 1/4" box extensions or spark rings needed
|
ELE18-03092
| Final | 8/28/2018 | 8/29/2018 | 8/29/2018 9:55:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting....labelling, disconnect, and OCPD ok to final
|
ELE18-03095
| Electrical Rough-In | 8/28/2018 | 8/29/2018 | 8/29/2018 9:22:11 AM | A | PASS |
|
|
Chad Van Orden is contact ###-####476 Phone #: ###-#### Inspection requested via web by Debby Pierce...wall cover ok...new exits cut in to existing ceiling...fixtures and tiles in front entry and cubicle area existing-new ceiling will be in 4 offices, breakroom, and storage rm
|
ELE18-03305
| Permanent Service | 8/28/2018 | 8/29/2018 | 8/29/2018 8:39:27 AM | A | NR |
|
|
inspect the house meter to be re-energized Phone #: ###-#### Inspection requested via web by Brad Baker...meter pack needs labelled and house panel circuits
|
ELE18-03271
| Electrical Rough-In | 8/27/2018 | 8/29/2018 | 8/29/2018 8:20:59 AM | A | PASS |
|
|
Ufer inspection. Ufer will be installed Tuesday Afternoon, and the concrete pour will be on Wednesday Afternoon. Please call John ###-####. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer...ok to cover
|
ELE18-02523
| Electrical Rough-In | 8/29/2018 | 8/29/2018 | 8/29/2018 7:50:39 AM | A | PASS |
|
|
underground....west side branch homeruns...ok to cover
|
ELE18-02703
| Electrical Rough-In | 8/28/2018 | 8/29/2018 | 8/28/2018 2:10:52 PM | A | PASS |
|
|
Early as possible please -Crew needs to be off site by 10:00 am. Phone #: ###-#### Inspection requested via web by Laurie Hoelscher...rooftop work verified by pictures-junctions for new pillar lights, blanking off light boxes at signage...boxes installed with blanks on pillar light locations
|
ELE16-00560
| Final | 8/28/2018 | 8/29/2018 | 8/28/2018 1:46:59 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Stacie Tasker...closing permit...was for temp pole only...inspections called in on wrong permit...job is completed
|
ELE18-03000
| Electrical Rough-In | 8/24/2018 | 8/29/2018 | 8/28/2018 10:31:19 AM | A | CANC |
|
|
Pls contact Brad (Foreman) @ ###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
|