MIS19-00266
| BLD-Conference | 8/23/2019 | 8/26/2019 | | A | |
|
|
status review
|
MIS19-00253
| BLD-Conference | 8/23/2019 | 8/27/2019 | | P | |
|
|
status review
|
MIS18-00431
| MIS-Aging Inspection | 8/29/2019 | 8/29/2019 | 9/6/2019 1:35:26 PM | | CANC |
|
|
|
MIS18-00430
| MIS-Aging Inspection | 8/29/2019 | 8/29/2019 | 9/4/2019 11:06:44 AM | | DONE |
|
|
|
BLD17-03026
| BLD-Aging Inspection | 8/29/2019 | 8/29/2019 | 8/30/2019 2:15:20 PM | | FAIL |
|
|
|
MIS18-00432
| MIS-Aging Inspection | 8/29/2019 | 8/29/2019 | 8/30/2019 1:15:42 PM | | DONE |
|
|
|
BLD16-02566
| BLD-Aging Inspection | 8/29/2019 | 8/29/2019 | 8/30/2019 1:14:43 PM | | PEND |
|
|
|
BLD19-00658
| BLD-Footing | 8/28/2019 | 8/29/2019 | 8/29/2019 5:13:34 PM | P | PEND |
|
|
Josh- rebar inspection and footing wall Phone #: ###-####,, pending special inspection report
|
BLD18-01728
| BLD-Final | 8/29/2019 | 8/29/2019 | 8/29/2019 5:12:49 PM | P | DEFR |
|
|
Larry Phone #: ###-####,, out of time
|
BLD19-02468
| BLD-Framing/Rough-in | 8/29/2019 | 8/29/2019 | 8/29/2019 5:11:05 PM | P | NR |
|
|
Danny Phone #: ###-####,, no plans
|
BLD19-01522
| BLD-Energy code compliance | 8/28/2019 | 8/29/2019 | 8/29/2019 5:10:12 PM | P | NR |
|
|
Ron Phone #: ###-####,, frame corrections not done
|
BLD19-01523
| BLD-Energy code compliance | 8/28/2019 | 8/29/2019 | 8/29/2019 5:07:23 PM | P | NR |
|
|
Ron Phone #: ###-####,, frame corrections not done
|
MIS19-00222
| BLD-Conference | 8/12/2019 | 8/29/2019 | 8/29/2019 5:06:38 PM | A | PEND |
|
|
Possible work without permits// status review
|
BLD19-01074
| BLD-Final | 8/28/2019 | 8/29/2019 | 8/29/2019 5:06:19 PM | P | PEND |
|
|
if you could please call 30 minutes ahead of time for the inspection that would be greatly appreciated Mike Teeter ###-####
Thanks Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
|
BLD19-03046
| BLD-Footing | 8/28/2019 | 8/29/2019 | 8/29/2019 4:12:59 PM | P | PART |
|
|
Pat Phone #: ###-####.. work in progress
|
BLD19-00885
| BLD-Energy code compliance | 8/28/2019 | 8/29/2019 | 8/29/2019 3:18:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD19-00885
| BLD-Framing/Rough-in | 8/27/2019 | 8/29/2019 | 8/29/2019 3:16:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD18-01759
| BLD-Energy code compliance | 8/29/2019 | 8/29/2019 | 8/29/2019 3:08:50 PM | P | PASS |
|
|
Ben Phone #: ###-####,, egress in basement to meet code
|
BLD19-01878
| BLD-Conference | 8/28/2019 | 8/29/2019 | 8/29/2019 2:29:58 PM | P | CANC |
|
|
Conference request to discuss framing and anchors. Phone #: ###-#### Inspection requested via web by Greg Stahl
|
BLD19-01878
| BLD-Conference | 8/28/2019 | 8/29/2019 | 8/29/2019 2:29:33 PM | P | PASS |
|
|
Conference request to discuss framing and anchors. Phone #: ###-#### Inspection requested via web by Greg Stahl,, normal code provisions,, ok to cut bolt off in the wrong location
|
BLD19-01026
| BLD-Conference | 8/27/2019 | 8/29/2019 | 8/29/2019 2:01:43 PM | A | NH |
|
|
Phone #: 5124260574 >> Inspection requested via mobile web by Paul Coniglio
|
BLD19-02990
| BLD-Footing | 8/28/2019 | 8/29/2019 | 8/29/2019 1:53:11 PM | A | NR |
|
|
plans are taped to porta John , if you want give me a 15 min heads up and I. Can Be there 208 703 6272 thanks Phone #: ###-#### Inspection requested via web by Chris Homeyer.. needs to meet back up area of 22'
|
BLD18-01441
| BLD-Ceiling Grid Inspection | 8/28/2019 | 8/29/2019 | 8/29/2019 1:47:07 PM | A | PASS |
|
|
Blake Phone #: ###-####,, ok to cover,, foam sprayed and then added blue foam at the rack ceiling line
|
BLD19-01426
| BLD-Final | 8/28/2019 | 8/29/2019 | 8/29/2019 12:46:54 PM | A | PEND |
|
|
Trevor-NEED TO TEXT Phone #: ###-####
|
BLD19-01852
| BLD-Framing/Rough-in | 8/28/2019 | 8/29/2019 | 8/29/2019 12:28:32 PM | A | FAIL |
|
|
Freg Phone #: ###-####,, c/n posted,, cut joists, straps, block joists, nail hangers, seal holes in plates, tighten hold down nuts, support stringer, etc, see paint for reference
|
BLD19-01828
| BLD-Wall Bracing | 8/28/2019 | 8/29/2019 | 8/29/2019 12:15:51 PM | A | PEND |
|
|
late AM // stem wall rebar // Mike Phone #: ###-####,, foundation pending special inspections
|
BLD19-01976
| BLD-Footing | 8/28/2019 | 8/29/2019 | 8/29/2019 11:47:07 AM | A | PASS |
|
|
Noah Phone #: ###-####
|
BLD18-04282
| BLD-Final | 8/28/2019 | 8/29/2019 | 8/29/2019 11:31:20 AM | A | PASS |
|
|
Ready for a final inspection. As per requested, handrail is installed, smoke alarm has been replaced with combo smoke/carbon monoxide detector and deck post bases are fully nailed. Phone #: ###-#### Inspection requested via web by Michael Barrie// c of o issued
|
BLD18-04282
| DOC - Permit Finaled | 8/29/2019 | 8/29/2019 | 8/29/2019 11:30:05 AM | P | PASS |
|
|
|
BLD19-00283
| BLD-Foundation | 8/28/2019 | 8/29/2019 | 8/29/2019 8:25:27 AM | A | DONE |
|
|
Noah; Phone #: ###-####
|