FIR19-00616
| INSP-Sprinkler Rough-in | 8/29/2019 | 8/29/2019 | 8/29/2019 3:05:41 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered. Per the general contractor the restroom walls will be extended to the ceiling. Plans are on site Phone #: ###-#### Inspection requested via web by Jonathan LaFond
|
BLD18-00103
| FIRE-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 3:02:57 PM | P | FAIL |
|
|
Provide knox box, provide sheetrock in closets as discussed and provide second floor signage.
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
FIR19-00433
| INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 2:04:58 PM | P | PASS |
|
|
Permit finaled. Asbuilts approved, Troy said he would approve once as builts were approved. No inspection needed Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00436
| INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 2:04:31 PM | P | PASS |
|
|
Permit finaled. Asbuilts approved, Troy said he would approve once as builts were approved. No inspection needed Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00435
| INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 1:56:13 PM | P | PASS |
|
|
Permit finaled. Asbuilts approved, Troy said he would approve once as builts were approved. No inspection needed Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00434
| INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 1:55:50 PM | P | PASS |
|
|
Permit finaled. Asbuilts approved, Troy said he would approve once as builts were approved. No inspection needed Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00033
| INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 1:55:15 PM | P | PASS |
|
|
Permit finaled. Nick Phone #: ###-####
|
FIR19-00060
| INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 1:54:36 PM | P | PASS |
|
|
Permit finaled. Nick Phone #: ###-####
|
FIR19-00059
| INSP-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 1:51:47 PM | P | PASS |
|
|
Permit finaled. Nick Phone #: ###-####
|
BLD18-00104
| FIRE-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 1:49:08 PM | P | PASS |
|
|
life safety passed. Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD18-00102
| FIRE-Final Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 1:46:55 PM | P | PASS |
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD19-01972
| FIRE-Final Inspection | 8/28/2019 | 8/29/2019 | 8/29/2019 1:06:46 PM | P | PASS |
|
|
Life safety passed. A suite number is to be provided prior to a building inspection as discussed. Jim Phone #: ###-#### Inspection requested via web by Jim Wellman
|
FIR19-00478
| INSP-Sprinkler Rough-in | 8/29/2019 | 8/29/2019 | 8/29/2019 1:05:44 PM | P | FAIL |
|
|
As-builts or plan mods are needed showing the piping routing changes (additional fittings), per the data sheet for the sidewall heads the min. mounting distance from the ceiling 4" but the heads have been installed at 3 1/2". Also the sidewall heads have a max distance to be mounted off a wall and that has been exceeded. Verification needs to be provided that shows the heads have been installed per their listing. I noted the center line in the garage has no wall behind the sidewall heads again is this listed. I will need verification from the state that sprinkler coverage is not needed in the closet close to the riser. I will need to see the tenting where the piping passes above the Kitchen cabinets. I have not looked at any of the fire pump/tank items. Contact: Ricky Sullivan Phone #: ###-#### Inspection requested via web by Hunter Fillmore
|
FIR19-00485
| INSP-Final Inspection | 8/27/2019 | 8/29/2019 | 8/29/2019 12:52:19 PM | P | PASS |
|
|
Permit finaled.
|
FIR19-00374
| INSP-Sprinkler Rough-in | 8/29/2019 | 8/29/2019 | 8/29/2019 12:30:09 PM | P | PART |
|
|
Tenting on the third floor needs repaired. I noted two pendant heads that are overspaced on the third floor. First floor FDC piping has not been installed yet. No piping to be covered.
|
NAF19-00014
| INSP-Sprinkler Rough-in/Hydro | 8/28/2019 | 8/29/2019 | 8/29/2019 11:36:48 AM | A | CANC |
|
|
Wrong inspection type scheduled. Should have been a fire life safety final. Call prior to going Phone #: 2087132042 >> Inspection requested via mobile web by Ryan
|
NAF19-00014
| INSP-Final | 8/29/2019 | 8/29/2019 | 8/29/2019 11:32:35 AM | P | DONE |
|
|
Life safety passed. The building inspector is approving the sub tenant exiting path that is not addressed on these plans as per the owner and our discussion.
|
NAF18-00126
| INSP-Final | 8/28/2019 | 8/29/2019 | 8/29/2019 11:16:06 AM | A | PART |
|
|
A temporary for life safety is approved by Boise Fire, for 30 days, until the shell/core BLD and the project related fire sprinkler permit, for the center area is addressed. Call prior to going Phone #: 2088304606 >> Inspection requested via mobile web by Zack
|
FIR18-00525
| INSP-Final Inspection | 8/28/2019 | 8/29/2019 | 8/29/2019 10:04:24 AM | A | FAIL |
|
|
Not ready for a final yet. Inspection was actually a walk through for the completed areas. The work in the finished areas has been completed. I noted one missing sprinkler canopy. Need rough to coover for the remaining west end first floor. Jon Beazer is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-03122
| BLD-Other | 8/28/2019 | 8/29/2019 | 8/29/2019 10:01:32 AM | A | FAIL |
|
|
Wrong inspection number scheduled. Should be a FIR. Tenting is not approved. tenting // Pat Phone #: ###-####
|
BLD19-01979
| FIRE-Final Inspection | 8/28/2019 | 8/29/2019 | 8/29/2019 8:18:52 AM | A | PASS |
|
|
Life safety passed. SIgned card. Scott Phone #: ###-####
|