Inspections for the day of: Thursday, August 3, 1995.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC95-00153 INSP - Final8/3/19958/3/199510/16/1995 12:00:00 AM
MEC3047820 INSP - Final8/2/19958/3/19958/3/1995 12:00:00 AMAFAIL
need: literature on w/h to check clearances on vent. 20 min
MEC95-00085 INSP - Final8/3/19958/3/19958/3/1995 12:00:00 AMAPASS
final ok 20 min
MEC95-00153 INSP - Final8/2/19958/3/19958/3/1995 12:00:00 AMAFAIL
need: extend condensate drain to edge of roof, insulate r.a. can and other duct r-6, and protect wood platform from the elements. 25 min
MEC3046630 INSP - Final8/3/19958/3/19958/3/1995 12:00:00 AMAPASS
final ok only thing left is to set gas f/p insert into place. 20 min
MEC3047285 INSP - Conference8/3/19958/3/19958/3/1995 12:00:00 AMAPASS
talked to superintent of project about what was left to do and about r/m mech. getting a permit. 20 min
MEC95-00388 INSP - Framing/ Rough-in8/3/19958/3/19958/3/1995 12:00:00 AMAPASS
corrections made. r/i ok 15 min
MEC95-00391 INSP - Framing/ Rough-in8/3/19958/3/19958/3/1995 12:00:00 AMPPASS
corrections were made on r.a. flex in attic. 20 min
MEC3047285 INSP - Framing/ Rough-in8/3/19958/3/19958/3/1995 12:00:00 AMPPASS
r/i ok on duct and two blower coil units in dinning room still need access ladder to equipment and gas piping. 20 min
MEC95-00357 INSP - Framing/ Rough-in8/3/19958/3/19958/3/1995 12:00:00 AMPFAIL
no access to building. 15 min
MEC95-00387 INSP - Wood stoves8/2/19958/3/19958/3/1995 12:00:00 AMPPASS
pellet stove meet all requirements of manufactures listing for installation. 25 min
MEC3047684 INSP - Final8/3/19958/3/19958/2/1995 12:00:00 AM PASS
20 MIN