PLM00-02706
| Plumbing Rough-in | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 13:23:55. Contact: ###-####.
|
PLM00-02718
| Water and/or Sewer | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | FAIL |
|
|
BRETT ###-#### WATER & SWR incomplete 8/3/2000 9:15:44 AM
|
PLM00-02721
| Water and/or Sewer | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | PASS |
|
|
keith ###-#### w/s final ok when backfilled wit 8/3/2000 9:28:28 AM the nice clean fill they 8/3/2000 9:28:38 AM have stochpilled on the job 8/3/2000 9:28:56 AM
|
PLM00-02713
| Sprinkler (Final) | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | PASS |
|
|
###-#### rob
|
PLM00-02723
| Sprinkler (Final) | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | PASS |
|
|
sprinkler Rob ###-####
|
PLM00-02265
| Final | 8/3/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM00-00754
| Final | 8/3/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 10:23:17. Contact: ###-####.-------- 3rd floor ==fn
|
PLM00-02718
| Water and/or Sewer | 8/3/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 8/3/2000 tallowtree
|
PLM00-02750
| Water and/or Sewer | 8/3/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 8/3/2000 existing grease line to relocated interceptor to existing stub 1/8" per foot but should be ok
|