Inspections for the day of: Thursday, August 3, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00043 BLD-Final8/2/20008/3/20008/3/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/02/2000 at 13:01:26. Contact: ###-####. C/C #18763 8/3/00 1:16:25 PM
BLD00-00638 BLD-Final8/2/20008/3/20008/3/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/02/2000 at 14:29:26. Contact: ###-####. Left c/N & called 8/3/00 1:16:42 PM
BLD99-03263 BLD-Final8/2/20008/3/20008/3/2000 12:00:00 AMAFAIL
JEFF-- ###-#### FN OCC No access & no answer to call 8/3/00 1:16:34 PM
MEC00-02465 Pressure Test8/2/20008/3/20008/3/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/02/2000 at 17:04:13. Contact: ###-####.
BLD00-01856 BLD-Footing8/3/20008/3/20008/3/2000 12:00:00 AMPPART
eason ###-#### ft
MEC00-02602 Final8/3/20008/3/20008/3/2000 12:00:00 AMPFAIL
One new roof top unit installed. Installed one used top unit and all duct. Key in mail box at front door after done please put back in mail box ###-#### Left c/N & talked to owner 8/7/00 8:28:37 AM
MEC00-02605 Rough-in8/3/20008/3/20008/3/2000 12:00:00 AMPPASS
###-#### heating return Done #340 8/7/00 8:28:14 AM
BLD00-02030 BLD-Footing8/3/20008/3/20008/3/2000 12:00:00 AMPPART
ft insp -tony ###-####
MEC00-02606 Final8/3/20008/3/20008/3/2000 12:00:00 AMPPASS
###-####