ELE00-01329
| Final | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | PASS |
|
|
###-####.completed. 8/3/2000 12:26:07 PM
|
ELE00-02206
| Final | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 18:02:50. Contact: ###-####. nec: 250-19(a). shall have continous outer finish. 8/3/2000 12:20:06 PM
|
ELE99-01707
| Electrical Rough-In | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/02/2000 at 10:02:44. Contact: ###-####. conference, clearances. 8/3/2000 12:25:22 PM
|
ELE00-02865
| Electrical Rough-In | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | A | PASS |
|
|
john ###-#### entrance is off alley between 9th and 8th suite 170. ele r/i ok. 8/3/2000 12:21:12 PM
|
ELE00-01340
| Final | 8/2/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | PASS |
|
|
rick ###-####. completed. 8/3/2000 12:26:39 PM
|
ELE00-02361
| Final | 8/3/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | FAIL |
|
|
call--###-#### fn--key in a/c disconnect if not open. nec: 410-12. lighting outlet boxes shall be covered: (garage exterior fixtures missing),
called contractor. 8/3/2000 5:17:09 PM
|
ELE00-02869
| Electrical Rough-In | 8/3/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/03/2000 at 10:17:00. Contact: ###-####.
|
ELE00-02206
| Final | 8/3/2000 | 8/3/2000 | 8/3/2000 12:00:00 AM | P | PASS |
|
|
###-#### around 3. corrections completed. 8/3/2000 5:05:42 PM
|