Inspections for the day of: Friday, August 3, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-02527 Electrical Rough-In8/2/20018/3/20018/3/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/02/2001 at 10:20:39. Contact: ###-####. ok cover ceiling 8/3/2001 9:05:47 AM
ELE01-02632 Electrical Rough-In8/2/20018/3/20018/3/2001 12:00:00 AMAFAIL
irrigation pump specialty contractor only correction NEC 240-3(d) #10 wire for 30amp pager ####-#### 8/3/2001 10:13:40 AM
ELE01-02633 Electrical Rough-In8/2/20018/3/20018/3/2001 12:00:00 AMAPASS
pool bonding ###-#### ok pool bonding 8/3/2001 10:55:24 AM
ELE01-01647 Final8/3/20018/3/20018/3/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/03/2001 at 06:35:16. Contact: ###-####. ok final 8/3/2001 11:17:18 AM
ELE01-01848 Final8/3/20018/3/20018/3/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/03/2001 at 06:39:11. Contact: ###-####. not ready 8/3/2001 9:30:41 AM
ELE01-02625 Electrical Rough-In8/3/20018/3/20018/3/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/03/2001 at 09:22:52. Contact: ###-####. ok cover under ground conduit 8/3/2001 2:34:20 PM
ELE01-02114 Electrical Rough-In8/3/20018/3/20018/3/2001 12:00:00 AMPNR
###-#### not ready 8/3/2001 1:11:32 PM
ELE01-01837 Electrical Rough-In8/3/20018/3/20018/3/2001 12:00:00 AMPFAIL
Randy ###-#### cover inspection corr NEC 210-52(1) 6ft spacing 300-4(d) 11/4 inch from framing member BCC all make to be done at rough in 8/3/2001 2:00:55 PM
ELE01-02510 Permanent Service8/3/20018/3/20018/3/2001 12:00:00 AMPPASS
per ser joe- cell ###-#### ok p/s u/g needs meter ok 8/3/2001 2:16:25 PM