Inspections for the day of: Friday, August 3, 2001.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-02234 Final8/2/20018/3/20018/3/2001 12:00:00 AMAPASS
###-####
BLD01-01381 BLD-Final8/2/20018/3/20018/3/2001 12:00:00 AMACANC
###-#### framing not final 8/2/2001 2:13:51 PM
BLD01-00171 BLD-Framing/Rough-in8/2/20018/3/20018/3/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/02/2001 at 14:37:55. Contact: ###-####. 8/3/2001 9:19:58 AM non load bearing walls inside ext area still need elec inspection 8/3/2001 11:23:19 AM
MEC01-01496 Final8/2/20018/3/20018/3/2001 12:00:00 AMAFAIL
###-#### c/n on site 8/3/2001 9:37:58 AM
MEC01-01497 Final8/2/20018/3/20018/3/2001 12:00:00 AMAFAIL
###-#### c/n on site 8/3/2001 9:37:41 AM
BLD01-01056 BLD-Footing8/2/20018/3/20018/3/2001 12:00:00 AMAPASS
###-####
MEC01-00001 Final8/2/20018/3/20018/3/2001 12:00:00 AMAPASS
key under rock by front door if locked Randy ###-#### reinspection
MEC01-02299 Pressure Test8/2/20018/3/20018/3/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/02/2001 at 14:02:03. Contact: ###-####.
BLD01-01381 BLD-Framing/Rough-in8/3/20018/3/20018/3/2001 12:00:00 AMAPASS
Added by Inspector: 425 On 8/3/2001 10:34:51 AM c/n on site ok to insulate
MEC01-02234 Pressure Test8/3/20018/3/20018/3/2001 12:00:00 AMAPASS
Added by Inspector: 425 On 8/3/2001 11:45:50 AM
MEC01-02299 Pressure Test8/3/20018/3/20018/3/2001 12:00:00 AMPPASS
Scheduled by Inspector: 425 On 8/3/2001 12:07:40 PM
BLD01-01776 BLD-Final8/3/20018/3/20018/3/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/03/2001 at 10:14:29. Contact: ###-####.
BLD00-02555 BLD-Final8/2/20018/3/20018/3/2001 12:00:00 AMPPASS
###-####
BLD01-01895 BLD-Framing/Rough-in8/3/20018/3/20018/3/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/03/2001 at 08:23:34. Contact: ###-####. framing ok to insulate will need to check draft stopping after insulation stairs are out of spec 8/3/2001 3:35:05 PM
BLD00-02851 BLD-Final8/2/20018/3/20018/3/2001 12:00:00 AMPPART
###-#### c/n on site ok for temp occ 8/3/2001 2:31:56 PM
BLD00-03535 BLD-Final8/2/20018/3/20018/3/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/02/2001 at 11:31:03. Contact: ###-####. mec corr notice not complete 8/3/2001 2:46:17 PM