FIR04-00277
| INSP-Final Inspection | 7/30/2004 | 8/3/2004 | 8/3/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/30/2004 at 8:37:53 AM. Contact: ###-####.
|
FIR04-00278
| INSP-Final Inspection | 7/30/2004 | 8/3/2004 | 8/3/2004 12:00:00 AM | A | PASS |
|
|
Larren; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIR04-00297
| INSP-Sprinkler Rough-in/Hydro | 8/2/2004 | 8/3/2004 | 8/3/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/2/2004 at 1:39:02 PM. Contact: ###-####. The 2.5 inch line had to be rerouted due to ducts, etc; system are now split to meet fire area separations 8/3/2004 11:01:35 AM
|
FIR04-00422
| INSP-Final Inspection | 8/2/2004 | 8/3/2004 | 8/3/2004 12:00:00 AM | A | PASS |
|
|
nick; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIR04-00428
| INSP-Conference | 8/3/2004 | 8/3/2004 | 8/3/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/3/2004 at 8:12:23 AM. Hydro test on OH system okay; may be required to this again depending on calc's for this floor 8/3/2004 2:52:38 PM
|
FIR04-00457
| INSP-Final Inspection | 8/2/2004 | 8/3/2004 | 8/3/2004 12:00:00 AM | P | PASS |
|
|
don; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|