FIR09-00290
| INSP-Final Inspection | 7/31/2009 | 8/3/2009 | 8/3/2009 6:02:55 PM | A | FAIL |
|
|
Noted several trouble and supervisory conditions on the main panel including missing devices, an open nac circut, duct detector trouble, sprinkler supervisory conditons, and a panel ground fault, (25 total). Correction items from the previous visit under repair at the time of inspection, need additional personel to facilitate testing including a tech at the FACP to report verification of signals, cite descriptors and addresses, silence and reset, etc. Discussed issues with site foreman and general contractor.
|
FIR09-00033
| INSP-Sprinkler Rough-in/Hydro | 7/29/2009 | 8/3/2009 | 8/3/2009 5:47:00 PM | A | PART |
|
|
Hydrostatic testing for systems 14, 21, 22, and riser room system #2 completed satisfactory. Overhead rough-in for the remainder of system 14 passed, -noted three locations where comm wire attatchments to the sprinkler piping need to be removed, system 31 OH rough-in okayed except at one storage room where walls need to extend to the deck for area separation.
|
FIR08-00451
| INSP-Final Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 5:39:32 PM | P | PASS |
|
|
Hood suppression system permit approved for final status.
|
BLD08-02249
| FIRE-Final Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 5:38:23 PM | P | PASS |
|
|
Life safety inspection for unit 546 passed.
|
BLD09-00610
| FIRE-Final Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 5:37:18 PM | A | PASS |
|
|
Fire life safety is acceptable pending repair of one EM light and one fire extinguisher to be posted at the work room area as agreed prior to structural final inspection.
|
BLD07-01784
| FIRE-Conference | 7/31/2009 | 8/3/2009 | 8/3/2009 5:29:38 PM | A | DONE |
|
|
Regarding items needed for final including project related FIR permit work.
|
FIR09-00371
| INSP-Final Inspection | 7/31/2009 | 8/3/2009 | 8/3/2009 11:54:15 AM | A | PASS |
|
|
Fire alarm work passed field testing, permit final approved.
|
BLD06-00708
| FIRE-Final Inspection | 7/31/2009 | 8/3/2009 | 8/3/2009 11:52:54 AM | A | PASS |
|
|
Noted corrections are complete, fire life safety finaled.
|
FIR09-00054
| INSP-Final Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 11:52:13 AM | P | PASS |
|
|
Buidling construction modifications completed to avoid spacing deficiencies. Fire sprinkler permit approved for final.
|
FIR09-00268
| FIR-Aging Inspection | 8/3/2009 | 8/3/2009 | 8/3/2009 11:50:21 AM | | DONE |
|
|
Pending site inspection request for permit final.
|
BLD08-01141
| FIRE-Final Inspection | 7/31/2009 | 8/3/2009 | 8/3/2009 11:49:41 AM | A | PASS |
|
|
Fire life safety inspection passed. Note: no signature card available on site.
|
BLD09-00376
| FIRE-Final Inspection | 7/31/2009 | 8/3/2009 | 8/3/2009 11:48:26 AM | A | FAIL |
|
|
See item numbers 1, 2, and 5 on fire code review notes for details regarding corrections to be made including missing address numbers, post signage at the main entry/exit, provide current certification for the fire extinguisher.
|