Inspections for the day of: Monday, August 3, 2009.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00423 Site Preparation8/3/20098/3/20098/4/2009 1:35:13 PM NR
ESC09-00352 Random Inspection8/3/20098/3/20098/3/2009 4:30:58 PMPPART
The discharge point in the south west end of project. This is due to the ammendments that have been made to the channel. Such as additional sediment traps and settling basins.
ESC07-00371 DOC - Permit Finaled8/3/20098/3/20098/3/2009 2:58:00 PMPPASS
ESC09-00475 Site Preparation8/3/20098/3/20098/3/2009 2:42:52 PM NR
ESC09-00256 Site Preparation8/3/20098/3/20098/3/2009 2:39:39 PM PASS
ESC08-01043 Conference8/3/20098/3/20098/3/2009 2:23:43 PMPPART
Verbal to RP:
clean out d.i.'s prior to the next storm events.
ESC09-00477 Site Preparation8/3/20098/3/20098/3/2009 2:11:46 PM NR
ESC09-00357 Site Preparation8/3/20098/3/20098/3/2009 1:46:12 PMPFAIL
Verbal to RP:
Post ESC sign. Will be having another site prep inspection on 8/5/09. Will go over the details of the ESC plan with the super and also the RP.
ESC09-00029 BMP Violation7/31/20098/3/20098/3/2009 11:08:56 AMAPASS
ESC09-00476 Site Preparation8/3/20098/3/20098/3/2009 9:46:11 AM NR
ESC08-00582 General Inspection8/3/20098/3/20098/3/2009 9:29:51 AM DONE
ESC08-00582 DOC - Permit Finaled8/3/20098/3/20098/3/2009 9:28:59 AMPPASS