FIR10-00583
| INSP-Sprinkler Rough-in | 8/3/2011 | 8/3/2011 | 8/3/2011 4:54:09 PM | P | PART |
|
|
Basement area rough-in passed. Noted items to be completed prior to final include; install dry pendents at the kitchen coolers, replace one existing old style sprinkler at the basement level, provide ball drip at the FDC, provide PRV at the riser, certify the backflow, install FDC caps. Forward flow and fire alarm interconnections not yet tested.
|
BLD11-01450
| FIRE-Final Inspection | 8/3/2011 | 8/3/2011 | 8/3/2011 4:48:42 PM | P | PASS |
|
|
Noted correction items verified for completion. Life safety passed.
|
FIR11-00342
| INSP-Sprinkler Rough-in | 8/3/2011 | 8/3/2011 | 8/3/2011 4:46:55 PM | P | PART |
|
|
Overhead work at the lobby area ceilings is approved for cover.
|
FIR11-00319
| INSP-Final Inspection | 8/2/2011 | 8/3/2011 | 8/3/2011 2:11:32 PM | A | PASS |
|
|
Fire alarm permit final approved.
|
FIR11-00267
| INSP-Final Inspection | 8/2/2011 | 8/3/2011 | 8/3/2011 1:53:25 PM | A | PART |
|
|
Site testing completed for new smoke detectors at the 8th, 7th, 6th and 5th floors. Descriptor at address 78 (5th) to accurately indicate the room located. Noted door holds at the 5th floor did not release upon fire alarm activation. Discussed inspection schedule for the remainder of the project.
|
BLD11-01354
| FIRE-Final Inspection | 8/2/2011 | 8/3/2011 | 8/3/2011 1:49:13 PM | A | PASS |
|
|
Fire life safety completed satisfactory. Noted deleted fire sprinkler head at the removed print room to be plugged or capped as discussed.
|
FIR11-00354
| INSP-Final Inspection | 8/2/2011 | 8/3/2011 | 8/3/2011 1:47:14 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|