Inspections for the day of: Wednesday, August 3, 2011.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00583 INSP-Sprinkler Rough-in8/3/20118/3/20118/3/2011 4:54:09 PMPPART
Basement area rough-in passed. Noted items to be completed prior to final include; install dry pendents at the kitchen coolers, replace one existing old style sprinkler at the basement level, provide ball drip at the FDC, provide PRV at the riser, certify the backflow, install FDC caps. Forward flow and fire alarm interconnections not yet tested.
BLD11-01450 FIRE-Final Inspection8/3/20118/3/20118/3/2011 4:48:42 PMPPASS
Noted correction items verified for completion. Life safety passed.
FIR11-00342 INSP-Sprinkler Rough-in8/3/20118/3/20118/3/2011 4:46:55 PMPPART
Overhead work at the lobby area ceilings is approved for cover.
FIR11-00319 INSP-Final Inspection8/2/20118/3/20118/3/2011 2:11:32 PMAPASS
Fire alarm permit final approved.
FIR11-00267 INSP-Final Inspection8/2/20118/3/20118/3/2011 1:53:25 PMAPART
Site testing completed for new smoke detectors at the 8th, 7th, 6th and 5th floors. Descriptor at address 78 (5th) to accurately indicate the room located. Noted door holds at the 5th floor did not release upon fire alarm activation. Discussed inspection schedule for the remainder of the project.
BLD11-01354 FIRE-Final Inspection8/2/20118/3/20118/3/2011 1:49:13 PMAPASS
Fire life safety completed satisfactory. Noted deleted fire sprinkler head at the removed print room to be plugged or capped as discussed.
FIR11-00354 INSP-Final Inspection8/2/20118/3/20118/3/2011 1:47:14 PMAPASS
Fire sprinkler permit finaled.