BLD11-00818
| FIRE-Final Inspection | 8/3/2012 | 8/3/2012 | 8/3/2012 5:09:44 PM | P | PART |
|
|
"Phase two" area including K line east approved for temporary occupancy. Final pending finishes at the chemical building, project related FIR permit finals and noted correction items.
|
BLD12-00920
| FIRE-Final Inspection | 8/3/2012 | 8/3/2012 | 8/3/2012 2:36:37 PM | P | PASS |
|
|
Correction items verified. Fire life safety inspection passed.
|
FIR12-00194
| INSP-Final Inspection | 8/1/2012 | 8/3/2012 | 8/3/2012 10:46:00 AM | A | PASS |
|
|
Fire alarm work passed inspection and testing. Permit final approved.
|
FIR12-00370
| INSP-Final Inspection | 8/3/2012 | 8/3/2012 | 8/3/2012 10:43:54 AM | A | PASS |
|
|
Scope of fire sprinkler work completed. Permit finaled.
|
FIR12-00370
| INSP-Sprinkler Rough-in | 8/2/2012 | 8/3/2012 | 8/3/2012 10:42:10 AM | A | PASS |
|
|
Field inspection passed.
|