PLM16-02502
| Plumbing Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 4:48:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM16-02769
| Water and/or Sewer | 8/3/2016 | 8/3/2016 | 8/3/2016 4:18:30 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by chris casady
|
PLM16-02769
| Sprinkler (Final) | 8/3/2016 | 8/3/2016 | 8/3/2016 4:18:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by chris casady
|
PLM16-02191
| Final | 8/3/2016 | 8/3/2016 | 8/3/2016 3:59:30 PM | P | PASS |
|
|
Jodi Phone #: ###-####
|
PLM16-02764
| Groundwork | 8/3/2016 | 8/3/2016 | 8/3/2016 3:39:13 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Cameron Neddo >gw inside the bld ok >water and sewer outside waiting on engineer.
|
PLM16-01583
| Final | 8/2/2016 | 8/3/2016 | 8/3/2016 2:20:13 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes >corrections not done
|
PLM16-02357
| Groundwork | 8/3/2016 | 8/3/2016 | 8/3/2016 1:58:46 PM | P | PART |
|
|
sand and oil interceptor inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige >interceptor piping ok
|
PLM16-02007
| Plumbing Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 1:41:39 PM | P | PASS |
|
|
Ready for plumbing rough in inspection. David Lee is journeyman on the job. Phone #: ###-#### Inspection requested via web by Candice Martin >shop ri ok
|
PLM16-01864
| Plumbing Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 1:24:04 PM | P | PASS |
|
|
Any questions call Brandon ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM16-02486
| Water and/or Sewer | 8/3/2016 | 8/3/2016 | 8/3/2016 12:04:49 PM | A | PASS |
|
|
test insp
|
PLM16-02078
| Water and/or Sewer | 8/2/2016 | 8/3/2016 | 8/3/2016 11:35:15 AM | A | PASS |
|
|
Sewer Inspection - Jack Willis is the Foreman. ###-#### Phone #: ###-#### Inspection requested via web by Dan Bastian >test ok on sewer lines.
|
PLM16-02080
| Plumbing Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 11:22:45 AM | A | FAIL |
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >no idea what the inspection is for, left msg with Ab, no answer from Mel.
|
PLM16-02777
| Plumbing Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 10:59:48 AM | A | FAIL |
|
|
We are requesting a plumbing rough-in inspection for a wash out/eyewash station. Contact Andy SIfford : ###-#### or Traci Easley : ###-#### for access. It is a vacant location and the back door will be unlocked. Phone #: ###-#### Inspection requested via web by Rusty Karel >need city approved plans showing new fixtures being added, explained to Traci the tenant.
|
PLM16-02455
| Final | 8/2/2016 | 8/3/2016 | 8/3/2016 10:12:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tobi Wilson
|
PLM16-01797
| Final | 8/2/2016 | 8/3/2016 | 8/3/2016 9:38:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM16-02742
| Plumbing Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 9:38:22 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM16-00569
| PLM-Aging Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 9:22:58 AM | | FAIL |
|
|
never inspected
|
PLM15-04182
| PLM-Aging Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 9:22:24 AM | | PART |
|
|
wip
|
PLM16-02743
| Plumbing Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 9:21:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM16-02226
| Water and/or Sewer | 8/2/2016 | 8/3/2016 | 8/3/2016 8:55:16 AM | A | FAIL |
|
|
backflow insp. >Need two hose clamps per connection >crimp clamps not approved. >plastic poly pipe must be 160 psi minimum. >need drain down valve ofter shutoff in ground >retest pvb after repairs and re inspect.
|
PLM16-02007
| Plumbing Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 8:29:48 AM | A | NR |
|
|
David Lee is journeyman on the job. His cell is ###-#### our office # is ###-####. Phone #: ###-#### Inspection requested via web by Candice Martin
|
PLM16-02486
| Water and/or Sewer | 8/2/2016 | 8/3/2016 | 8/2/2016 4:12:55 PM | A | PART |
|
|
Ron Phone #: ###-#### >sewer ok to cover, need to test.
|
PLM16-02777
| Plumbing Rough-in | 8/2/2016 | 8/3/2016 | 8/2/2016 3:46:37 PM | A | CANC |
|
|
We are requesting a plumbing rough-in inspection for a wash out/eyewash station. Contact Andy Sifford : Phone #: ###-#### >> Inspection requested via web by Rusty Karel Inspection cancelled from web by: Rusty Karel
|