FIR16-00488
| INSP-Final Inspection | 8/3/2016 | 8/3/2016 | 8/4/2016 9:28:50 AM | P | FAIL |
|
|
Permit will be ok to final when directed by the Boise Fire Dept. An upgrade agreement is required for the fire alarm system.
|
BLD16-02446
| FIRE-Final Inspection | 8/3/2016 | 8/3/2016 | 8/4/2016 9:28:23 AM | P | FAIL |
|
|
Life safety will be ok to final when directed by the Boise Fire Dept. An upgrade agreement is required for the fire alarm system.
|
FIR16-00432
| INSP-Final Inspection | 8/3/2016 | 8/3/2016 | 8/4/2016 9:25:40 AM | P | CANC |
|
|
Rand Phone #: ###-####
|
FIR16-00395
| INSP-Sprinkler Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 1:04:02 PM | P | PASS |
|
|
See the city approved plans for piping above hardlids that is ok to cover.
|
BLD16-02778
| FIRE-Final Inspection | 8/2/2016 | 8/3/2016 | 8/3/2016 1:03:10 PM | A | PASS |
|
|
life safety passed. Carl Madsen is ok with a marked path (shelving units used) from the sales area through the Store Room. He is going to update plans
|
BLD15-04448
| FIRE-Conference | 8/2/2016 | 8/3/2016 | 8/3/2016 12:03:46 PM | A | DONE |
|
|
Permit did not originally require life safety, sprinkler or alarm sign offs. I had that changed by the permit technicians due to new sprinklers, and what appears to be fire alarm without a permit.
|
FIR16-00493
| INSP-Final Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 12:02:09 PM | P | PASS |
|
|
Permit finaled
|
FIR15-00709
| INSP-Sprinkler Rough-in/Hydro | 8/2/2016 | 8/3/2016 | 8/3/2016 11:31:34 AM | A | PASS |
|
|
Please schedule the inspection Overhead hydro's for 1st, 2nd, and 3rd floors passed.
|
FIR16-00495
| INSP-Sprinkler Rough-in | 8/2/2016 | 8/3/2016 | 8/3/2016 9:37:01 AM | A | PASS |
|
|
See the city approved plans for Restrooms where piping is ok to cover.
|