GCB15-00145
| GCB-Final | 8/2/2016 | 8/3/2016 | 8/3/2016 4:45:03 PM | P | FAIL |
|
|
MJ ###-#### - requested call ahead. Provide engineering for cable guards. Install cane guard as shown on approved plans. handrail extensions on interior stairs do not meet the minimum 12 inches. Provide hanrails/edge protection on ramp at accessible route.
|
BLD16-01778
| BLD-Framing/Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 3:36:05 PM | P | FAIL |
|
|
Michale Phone #: ###-####. NAil 2ply girder truss C1 as per the truss engineering. Replace hanger on A1 truss and provide blocking and new hangar. Ok to insulate.
|
BLD16-01777
| BLD-Framing/Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 3:34:37 PM | P | PART |
|
|
Michale Phone #: ###-####. Provide truss engineering. Fireblock fur by stairs in mech. room. Ok to insulate.
|
BLD16-00339
| BLD-Conference | 8/3/2016 | 8/3/2016 | 8/3/2016 2:43:27 PM | P | DONE |
|
|
Permit has not been issued and is going to expire. Need to know if TI was completed and if Behavioral Health Services is in the space. Permit is for TI and Occupancy. These spaces are occupied, No one knows of any remodel work.
|
BLD16-00244
| BLD-Wall Bracing | 8/3/2016 | 8/3/2016 | 8/3/2016 2:32:32 PM | P | CANC |
|
|
Insulation Bob Phone #: ###-####. Per contractor, inspector #425 has already inspected and inspection request was made in error.
|
BLD16-02778
| BLD-Final | 8/2/2016 | 8/3/2016 | 8/3/2016 2:08:01 PM | P | PASS |
|
|
Phone #: ###-####. OK for perm occ.
|
BLD15-04514
| BLD-Framing/Rough-in | 8/3/2016 | 8/3/2016 | 8/3/2016 1:44:44 PM | P | PASS |
|
|
John Phone #: ###-####. Roof trusses wrapped.
|
BLD16-02800
| BLD-Footing | 8/3/2016 | 8/3/2016 | 8/3/2016 1:23:48 PM | P | PASS |
|
|
Ashley Phone #: ###-####. Block and Tie ok.
|
BLD16-02778
| BLD-Final | 8/2/2016 | 8/3/2016 | 8/3/2016 11:36:33 AM | A | CANC |
|
|
Stacia or Chris Phone #: ###-####. Moved to pm.
|
BLD16-02361
| BLD-Energy code compliance | 8/2/2016 | 8/3/2016 | 8/3/2016 10:37:05 AM | A | PASS |
|
|
Andy Phone #: ###-####
|
BLD16-02362
| BLD-Energy code compliance | 8/2/2016 | 8/3/2016 | 8/3/2016 10:37:05 AM | A | PASS |
|
|
Andy Phone #: ###-####
|
BLD16-01268
| BLD-Final | 8/2/2016 | 8/3/2016 | 8/3/2016 9:49:57 AM | A | FAIL |
|
|
Phone #: 5134849 >> Inspection requested via mobile web by Cody walker. Mech. final? POst address, complete exterior envelope.
|
BLD16-02079
| BLD-Energy code compliance | 8/2/2016 | 8/3/2016 | 8/3/2016 9:14:42 AM | A | PASS |
|
|
Billie Phone #: ###-####
|
BLD16-01252
| BLD-Final | 8/2/2016 | 8/3/2016 | 8/3/2016 8:56:38 AM | A | PART |
|
|
Kent Phone #: ###-####. Ok for temp occ. Contractor has ordered new main entry/exit doors. Existing main doors have manual flush bolts.
|