FIR16-00128
| INSP-Final Inspection | 8/1/2016 | 8/3/2016 | 8/3/2016 2:52:52 PM | P | CANC |
|
|
Inspection request was for clearwater TI, this inspection request cancelled.
|
FIR16-00067
| INSP-Final Inspection | 8/1/2016 | 8/3/2016 | 8/3/2016 2:51:23 PM | P | PART |
|
|
Fire alarm audio visual devices and door closers inspected on levels 5 and 8, active fire alarms on level 5 activated the audio visual devices on level that have been installed on level 4 and all devices on level 6. Active fire alarms on level 8 activated the audio visual devices that have been installed on level 9 and all of the devices on level 7.
|
BLD15-01519
| FIRE-Final Inspection | 8/2/2016 | 8/3/2016 | 8/3/2016 10:29:17 AM | A | PART |
|
|
Partial life fire safety inspection passed/complete. Fire alarm inspections for levels 2 and 3 complete, fire sprinkler inspections for levels 2 and 3 complete, pre-action fire sprinkler inspection for server room on level 3 complete, clean agent fire suppression system for server room on level 3 complete, fire extinguishers are in place with current inspection tags on levels 2 and 3. Final life fire safety inspection for levels 2 and 3 complete.
|
FIR16-00227
| INSP-Sprinkler Rough-in/Hydro | 8/3/2016 | 8/3/2016 | 8/3/2016 10:24:29 AM | A | PASS |
|
|
24 hour air test for new dry system install passed/complete.
|
FIR16-00452
| INSP-Final Inspection | 8/3/2016 | 8/3/2016 | 8/3/2016 9:57:31 AM | A | PART |
|
|
Final fire alarm inspection for area of work on level 4 passed/complete, remaining area of work associated with this permit to be completed at a later date.
|
FIR16-00452
| INSP-Sprinkler Rough-in/Hydro | 8/2/2016 | 8/3/2016 | 8/3/2016 9:55:44 AM | A | CANC |
|
|
Inspection request is for a partial final for this permit, not sprinkler related. This inspection request cancelled and the correct inspection request will be generated.
|
FIR16-00256
| INSP-Sprinkler Rough-in/Hydro | 8/2/2016 | 8/3/2016 | 8/3/2016 9:54:02 AM | A | PASS |
|
|
Rough to cover inspection complete, notated area with red ink that is approved for cover on the city approved drawings, also notated city approved drawings with red ink where hydrostatic test is complete.
|
BLD15-01114
| FIRE-Final Inspection | 8/2/2016 | 8/3/2016 | 8/3/2016 8:56:08 AM | A | PASS |
|
|
No fire sprinklers, smoke/carbon minoxide detectors are stand-alone and not monitored. Final life fire safety inspection passed/complete.
|