FIR16-00284
| INSP-Sprinkler Rough-in | 8/2/2017 | 8/3/2017 | 8/3/2017 1:35:02 PM | A | PASS |
|
|
Installed verifed 2 dry flex heads in the breezeway on Ground Level. Piping is ok to cover.
|
FIR17-00227
| INSP-Final Inspection | 8/1/2017 | 8/3/2017 | 8/3/2017 9:44:52 AM | A | FAIL |
|
|
Provide functional trip test to verify electrical and gas shut off that utilizes test line and remote pull station, lights under the hood need to shut off, provide test report.
|