PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, August 3, 2018
.
Number of inspections:
18
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00987
General Inspection
8/2/2018
8/3/2018
8/6/2018 4:29:04 PM
A
PASS
SFH in progress. No trackout or discharges from site. No corrections requested
ESC17-01135
General Inspection
8/3/2018
8/3/2018
8/6/2018 3:52:33 PM
CANC
ESC18-00645
General Inspection
8/2/2018
8/3/2018
8/6/2018 3:51:46 PM
A
PASS
Demo complete, new SFH in progress. See ESC18-00987 for coverage.
ESC18-00644
General Inspection
8/2/2018
8/3/2018
8/6/2018 3:51:12 PM
A
PASS
Demo complete, new SFH in progress. See ESC18-00987 for coverage.
ESC17-01262
Aging Inspection
8/3/2018
8/3/2018
8/3/2018 3:24:46 PM
CANC
ESC16-00741
General Inspection
8/3/2018
8/3/2018
8/3/2018 3:23:32 PM
PASS
ESC18-00622
Complaint Inspection
8/3/2018
8/3/2018
8/3/2018 3:02:01 PM
P
CANC
rescheduled
ESC17-01132
Random Inspection
8/3/2018
8/3/2018
8/3/2018 3:01:18 PM
A
PART
Correction requested:
- clean up concrete slurry from cutting entrance on Whitewater.
Verbal correction to RP Chase.
ESC16-00353
General Inspection
8/3/2018
8/3/2018
8/3/2018 1:26:35 PM
PEND
Two SFHs complete.
Developer or new builder will need to install new DI bag on Clubview.
ESC18-00963
General Inspection
8/2/2018
8/3/2018
8/3/2018 12:20:49 PM
A
PASS
11 AM
Perimeter wattle installed. RP onsite. Permit sign to posted on the south property line fence. Replace existing storm drain and underground seepage with a new and improved system as well sidewalk and gutter. This permit was the SFH demo but now RP is Steve with CMG.
ESC12-00403
General Inspection
8/3/2018
8/3/2018
8/3/2018 11:43:22 AM
PASS
Construction on site at Jump is complete. No disturbed area or loose material. Temp BMPs have been removed.
ESC permit open to monitor clean up of staging yards, washout dump area, and employee parking utilized for project.
ESC17-00018
General Inspection
8/3/2018
8/3/2018
8/3/2018 11:40:00 AM
P
PART
Correction needed:
- washout is full and needs service
- roll off washout pan needs to be re-located so area under neath can be swept and cleaned.
- new placement should be > 50 ft from storm drain; preferably on an open lot rather than on the road
Verbal correction issued to Hunter Homes RP Kyle. He said will get that done this afternoon.
ESC17-01280
Aging Inspection
8/3/2018
8/3/2018
8/3/2018 10:26:46 AM
PASS
Project complete. No ESC requests. Homeowner working on landscaping, no violations. Permit finaled.
ESC17-01280
DOC - Permit Finaled
8/3/2018
8/3/2018
8/3/2018 10:26:16 AM
P
PASS
ESC17-00896
Aging Inspection
8/3/2018
8/3/2018
8/3/2018 10:09:03 AM
PASS
Home complete and landscaped. Temp BMPs (DI bags, washout) to be removed when RH#7 SFHs are complete
ESC17-00896
DOC - Permit Finaled
8/3/2018
8/3/2018
8/3/2018 10:08:19 AM
P
PASS
ESC17-00027
Site Final
8/2/2018
8/3/2018
8/3/2018 8:05:59 AM
A
CANC
ESC18-01071
General Inspection
8/2/2018
8/3/2018
8/2/2018 4:30:27 PM
A
CANC