Inspections for the day of: Friday, August 3, 2018.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00987 General Inspection8/2/20188/3/20188/6/2018 4:29:04 PMAPASS
SFH in progress. No trackout or discharges from site. No corrections requested
ESC17-01135 General Inspection8/3/20188/3/20188/6/2018 3:52:33 PM CANC
ESC18-00645 General Inspection8/2/20188/3/20188/6/2018 3:51:46 PMAPASS
Demo complete, new SFH in progress. See ESC18-00987 for coverage.
ESC18-00644 General Inspection8/2/20188/3/20188/6/2018 3:51:12 PMAPASS
Demo complete, new SFH in progress. See ESC18-00987 for coverage.
ESC17-01262 Aging Inspection8/3/20188/3/20188/3/2018 3:24:46 PM CANC
ESC16-00741 General Inspection8/3/20188/3/20188/3/2018 3:23:32 PM PASS
ESC18-00622 Complaint Inspection8/3/20188/3/20188/3/2018 3:02:01 PMPCANC
rescheduled
ESC17-01132 Random Inspection8/3/20188/3/20188/3/2018 3:01:18 PMAPART
Correction requested:

- clean up concrete slurry from cutting entrance on Whitewater.

Verbal correction to RP Chase.
ESC16-00353 General Inspection8/3/20188/3/20188/3/2018 1:26:35 PM PEND
Two SFHs complete.

Developer or new builder will need to install new DI bag on Clubview.
ESC18-00963 General Inspection8/2/20188/3/20188/3/2018 12:20:49 PMAPASS
11 AM

Perimeter wattle installed. RP onsite. Permit sign to posted on the south property line fence. Replace existing storm drain and underground seepage with a new and improved system as well sidewalk and gutter. This permit was the SFH demo but now RP is Steve with CMG.
ESC12-00403 General Inspection8/3/20188/3/20188/3/2018 11:43:22 AM PASS
Construction on site at Jump is complete. No disturbed area or loose material. Temp BMPs have been removed.

ESC permit open to monitor clean up of staging yards, washout dump area, and employee parking utilized for project.
ESC17-00018 General Inspection8/3/20188/3/20188/3/2018 11:40:00 AMPPART
Correction needed:
- washout is full and needs service
- roll off washout pan needs to be re-located so area under neath can be swept and cleaned.
- new placement should be > 50 ft from storm drain; preferably on an open lot rather than on the road

Verbal correction issued to Hunter Homes RP Kyle. He said will get that done this afternoon.
ESC17-01280 Aging Inspection8/3/20188/3/20188/3/2018 10:26:46 AM PASS
Project complete. No ESC requests. Homeowner working on landscaping, no violations. Permit finaled.
ESC17-01280 DOC - Permit Finaled8/3/20188/3/20188/3/2018 10:26:16 AMPPASS
ESC17-00896 Aging Inspection8/3/20188/3/20188/3/2018 10:09:03 AM PASS
Home complete and landscaped. Temp BMPs (DI bags, washout) to be removed when RH#7 SFHs are complete
ESC17-00896 DOC - Permit Finaled8/3/20188/3/20188/3/2018 10:08:19 AMPPASS
ESC17-00027 Site Final8/2/20188/3/20188/3/2018 8:05:59 AMACANC
ESC18-01071 General Inspection8/2/20188/3/20188/2/2018 4:30:27 PMACANC