Inspections for the day of: Monday, August 3, 2020.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-01479 BLD-Framing/Rough-in8/3/20208/3/20208/4/2020 9:52:32 AMPPART
Insulation corridors level 3 and 4 in area A. Area separation wall area B-C Perimeter framing with hopes of starting some top down insulation and drywall on exterior 2 hour wall Phone #: ###-#### Inspection requested via web by Jim Williams ok to rock lids in corridors
BLD18-02811 BLD-Conference7/31/20208/3/20208/4/2020 12:00:00 AMADONE
Per Request by Dave Hannah putting in conference inspection - GDB Phone #: ###-####. Dave issued correction notice to owner requesting completion of this scope of work and obtaining a final inspection and issuance of a CO. An additional permit is also reequired for the assembly area in rear yard.
BLD19-02339 BLD-Wall cover8/3/20208/3/20208/3/2020 2:23:00 PMPPART
Please come verify work complete to cover stair 2 first floor 2 hour. First floor loggia for cover in the lobby as well.
Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense
BLD20-00178 BLD-Ceiling Grid Inspection8/3/20208/3/20208/3/2020 2:22:35 PMPPASS
Dameion *screened* Phone #: ###-####
BLD20-01766 BLD-Final7/31/20208/3/20208/3/2020 1:00:57 PMPPASS
screened // Nathan Phone #: ###-####
BLD20-01766 DOC - Permit Finaled8/3/20208/3/20208/3/2020 1:00:47 PMPPASS
BLD20-01059 BLD-Framing/Rough-in7/31/20208/3/20208/3/2020 10:59:13 AMAPASS
Phone #: 2085149738 >> Inspection requested via mobile web by Brent Anderson