BLD19-01479
| BLD-Framing/Rough-in | 8/3/2020 | 8/3/2020 | 8/4/2020 9:52:32 AM | P | PART |
|
|
Insulation corridors level 3 and 4 in area A. Area separation wall area B-C Perimeter framing with hopes of starting some top down insulation and drywall on exterior 2 hour wall Phone #: ###-#### Inspection requested via web by Jim Williams ok to rock lids in corridors
|
BLD18-02811
| BLD-Conference | 7/31/2020 | 8/3/2020 | 8/4/2020 12:00:00 AM | A | DONE |
|
|
Per Request by Dave Hannah putting in conference inspection - GDB Phone #: ###-####. Dave issued correction notice to owner requesting completion of this scope of work and obtaining a final inspection and issuance of a CO. An additional permit is also reequired for the assembly area in rear yard.
|
BLD19-02339
| BLD-Wall cover | 8/3/2020 | 8/3/2020 | 8/3/2020 2:23:00 PM | P | PART |
|
|
Please come verify work complete to cover stair 2 first floor 2 hour. First floor loggia for cover in the lobby as well. Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD20-00178
| BLD-Ceiling Grid Inspection | 8/3/2020 | 8/3/2020 | 8/3/2020 2:22:35 PM | P | PASS |
|
|
Dameion *screened* Phone #: ###-####
|
BLD20-01766
| BLD-Final | 7/31/2020 | 8/3/2020 | 8/3/2020 1:00:57 PM | P | PASS |
|
|
screened // Nathan Phone #: ###-####
|
BLD20-01766
| DOC - Permit Finaled | 8/3/2020 | 8/3/2020 | 8/3/2020 1:00:47 PM | P | PASS |
|
|
|
BLD20-01059
| BLD-Framing/Rough-in | 7/31/2020 | 8/3/2020 | 8/3/2020 10:59:13 AM | A | PASS |
|
|
Phone #: 2085149738 >> Inspection requested via mobile web by Brent Anderson
|