Inspections for the day of: Monday, August 3, 2020.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD20-01610 BLD-Footing7/31/20208/3/20208/3/2020 4:04:59 PMPCANC
Dane Phone #: ###-####
BLD20-01609 BLD-Footing7/31/20208/3/20208/3/2020 4:04:51 PMPCANC
Dane Phone #: ###-####
BLD20-01608 BLD-Footing7/31/20208/3/20208/3/2020 4:04:41 PMPCANC
Dane Phone #: ###-####
BLD20-01603 BLD-Footing7/31/20208/3/20208/3/2020 4:04:33 PMPCANC
Dane Phone #: ###-####
BLD20-01603 BLD-Conference8/3/20208/3/20208/3/2020 4:04:27 PMPDONE
Dane Phone #: ###-####. Went over structural details and 2hr. fire wall details.
BLD20-01608 BLD-Conference8/3/20208/3/20208/3/2020 4:03:59 PMPDONE
Dane Phone #: ###-####. Went over structural details and 2hr. fire wall details.
BLD20-01609 BLD-Conference8/3/20208/3/20208/3/2020 4:03:32 PMPDONE
Dane Phone #: ###-####. Went over structural details and 2hr. fire wall details.
BLD20-01610 BLD-Conference8/3/20208/3/20208/3/2020 4:03:09 PMPDONE
Dane Phone #: ###-####. Went over structural details and 2hr. fire wall details.
BLD20-00308 BLD-Final7/31/20208/3/20208/3/2020 4:02:19 PMPNR
screened // Kyle Phone #: ###-####. Needs fire/life/safety and zoning finals.
BLD20-00725 BLD-Final7/31/20208/3/20208/3/2020 4:01:51 PMPNR
screened // Kyle Phone #: ###-####. Needs fire/life/safety and zoning finals.
BLD19-03042 BLD-Conference7/31/20208/3/20208/3/2020 2:53:40 PMPDONE
Bob *screened* Phone #: ###-####
BLD20-01611 BLD-Footing7/31/20208/3/20208/3/2020 2:53:25 PMPCANC
Dane Phone #: ###-####
BLD20-01225 BLD-Final8/3/20208/3/20208/3/2020 1:22:39 PMPPASS
Talitha Phone #: ###-####
BLD20-01225 DOC - Permit Finaled8/3/20208/3/20208/3/2020 1:22:30 PMPPASS
BLD20-01900 BLD-Footing8/3/20208/3/20208/3/2020 1:06:09 PMPPASS
Screened- Gotti Phone #: ###-####
BLD20-01947 BLD-Final8/3/20208/3/20208/3/2020 12:48:17 PMPPASS
BLD20-01947 DOC - Permit Finaled8/3/20208/3/20208/3/2020 12:48:09 PMPPASS
BLD20-01947 BLD-Framing/Rough-in8/3/20208/3/20208/3/2020 12:47:59 PMPPASS
Screened- Nancy Phone #: ###-####
BLD20-01519 BLD-Wall Bracing7/31/20208/3/20208/3/2020 10:44:22 AMAPASS
Same *screened* Phone #: ###-####
BLD20-00093 BLD-Framing/Rough-in7/31/20208/3/20208/3/2020 9:40:31 AMAPASS
screened / Steve Phone #: ###-####. Hold downs.
BLD20-00033 BLD-Ceiling Grid Inspection7/31/20208/3/20208/3/2020 9:15:17 AMAPASS
Randy *screened* Phone #: ###-####
BLD20-00026 BLD-Framing/Rough-in7/31/20208/3/20208/3/2020 8:54:31 AMAPART
exterior wall electrical passed and need to insulate and rock monday. Phone #: ###-#### Inspection requested via web by todd smock. Ok to insulate exterior walls only. Needs to provide strap at double top plate break at plumbing penetration for roof drain. Needs to provide truss engineering on energy code inspection.