Inspections for the day of: Wednesday, August 30, 2000.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02185 BLD-Framing/Rough-in8/29/20008/30/20008/30/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/29/2000 at 13:11:04. Contact: ###-####.
BLD00-01473 BLD-Framing/Rough-in8/29/20008/30/20008/30/2000 12:00:00 AMAPASS
SHEAR NAIL--- DANTE-- ###-#### exterior ok for cover. 8/29/2000 2:39:49 PM
BLD00-00310 BLD-Final8/29/20008/30/20008/30/2000 12:00:00 AMAPART
GREG-- ###-#### FN OCC final ok pending p/w sign off. 8/30/2000 4:07:50 PM
BLD00-02497 BLD-Foundation8/29/20008/30/20008/30/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/29/2000 at 15:41:27. Contact: ###-####. mono pour ok 8/30/2000 8:53:43 AM
BLD99-03453 BLD-Final8/29/20008/30/20008/30/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/29/2000 at 16:15:59. Contact: ###-####. l/c ok 8/30/2000 3:02:23 PM
BLD99-03500 BLD-Final8/29/20008/30/20008/30/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/29/2000 at 16:16:47. Contact: ###-####. l/c ok 8/30/2000 3:02:57 PM
BLD99-02049 BLD-Framing/Rough-in8/25/20008/30/20008/30/2000 12:00:00 AMAFAIL
WEST EQUIP ROOM ROOF---TOM ###-#### -- no ancer on phone or person on site to contact. 8/30/2000 3:46:29 PM
BLD00-01827 BLD-Foundation8/29/20008/30/20008/30/2000 12:00:00 AMAPASS
re-bar insp early am Elliot ###-####
BLD99-02418 BLD-Final8/29/20008/30/20008/30/2000 12:00:00 AMPNR
Sherry ###-#### need other sign offs. 8/30/2000 5:54:27 PM
BLD99-02419 BLD-Final8/29/20008/30/20008/30/2000 12:00:00 AMPNR
###-####---SHERI FN OCC need other sign offs. 8/30/2000 5:54:36 PM
BLD00-01933 BLD-Framing/Rough-in8/29/20008/30/20008/30/2000 12:00:00 AMPFAIL
Don ###-#### arch. to address 2 hr. ceilling continuity of all walls top plates and ele,plm intagraty. 8/31/2000 12:22:40 PM
BLD00-01563 BLD-Concrete8/23/20008/30/20008/30/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/23/2000 at 17:54:18. Contact: ###-####. pending report. 8/29/2000 10:13:20 AM
BLD00-01862 BLD-Framing/Rough-in8/30/20008/30/20008/30/2000 12:00:00 AMPPASS
Unit 700 Gene ###-####
BLD00-01597 BLD-Framing/Rough-in8/30/20008/30/20008/30/2000 12:00:00 AMPPASS
CEILING GRID-- MARK ###-####
BLD00-02453 BLD-Final8/30/20008/30/20008/30/2000 12:00:00 AMPPASS
###-####- DAVE FN OCC l/c ok. 8/30/2000 5:29:51 PM
BLD00-02477 BLD-Framing/Rough-in8/30/20008/30/20008/30/2000 12:00:00 AMPFAIL
steve ###-#### framing ok pending plan review aproval of two kitchens in a vn r3. 8/31/2000 10:43:56 AM 8/31/2000 10:45:01 AM 8/31/2000 12:21:18 PM
BLD00-01746 BLD-Conference8/30/20008/30/20008/30/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/30/2000 at 11:25:47. Contact: ###-####. occ. wall not designed to be built need arch. to shw configuration in field. 8/31/2000 10:08:56 AM