BLD00-00967
| BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/31/2000 12:00:00 AM | P | PART |
|
|
craig fr ###-####
ok to insulate,, verify energy compliance 8/31/2000 12:01:34 PM
|
BLD00-02455
| BLD-Foundation | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PART |
|
|
dane ###-#### found wall insp
WIP ok w/ verbal corrections 8/30/2000 10:52:17 AM
|
BLD00-02290
| BLD-Foundation | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PART |
|
|
dane ###-#### found wall
WIP ok w/ verbal 8/30/2000 10:52:51 AM
|
BLD00-01625
| BLD-Energy code compliance | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 11:57:02. Contact: ###-####.
already done by 408 8/30/2000 10:50:46 AM
|
BLD00-01625
| BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 11:57:42. Contact: ###-####.
already done by 408 8/30/2000 10:51:13 AM
|
BLD00-01771
| BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PART |
|
|
as early as possible \\###-#### deanna
c/n on straps, nails... ok to insulate 8/30/2000 9:46:41 AM
|
BLD00-02467
| BLD-Footing | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PART |
|
|
Kevin ###-####
no forms in place , verbal corrections(, roots, go per plan) 8/30/2000 11:45:34 AM
|
BLD00-01482
| BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 15:57:37. Contact: ###-####.
|
BLD00-01731
| BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | A | PART |
|
|
- ###-#### Ron
ok to insulate, verify p/l soffit 5/8 gyp. at final 8/30/2000 9:48:47 AM
c/n left on 5/8" gyp. 8/30/2000 9:57:56 AM
|
BLD00-01514
| BLD-Final | 8/30/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | P | PASS |
|
|
rob ###-####
|
BLD00-01564
| BLD-Framing/Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/30/2000 at 08:22:42. Contact: ###-####.
c/n posted,,, need approved plans , do not cover 8/30/2000 3:03:09 PM
|
BLD00-00142
| BLD-Framing/Rough-in | 8/30/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | P | PART |
|
|
reinspection on shear Bob ###-####
outside shear ok. can side now 8/30/2000 3:55:35 PM
|
BLD00-02120
| BLD-Footing | 8/30/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | P | NR |
|
|
Tim ###-#### early pm
|
BLD99-03675
| BLD-Final | 8/30/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | P | FAIL |
|
|
GARY-- ###-#### FN OCC
c/n posted,,, temp. glass top of stairs,,, firedoor ,, insulate duct boots 8/30/2000 2:12:03 PM
|
BLD00-01180
| BLD-Footing | 8/30/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | P | PART |
|
|
Todd ###-####
need letter on soils on front retaining walls on fill and drain material 8/30/2000 2:29:54 PM
|
BLD00-02125
| BLD-Framing/Rough-in | 8/29/2000 | 8/30/2000 | 8/30/2000 12:00:00 AM | P | PART |
|
|
###-#### or ###-####
ok to insulate upstairs, verify energy seal 8/30/2000 3:58:47 PM
|