BLD01-02200
| BLD-Framing/Rough-in | 8/28/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | A | PART |
|
|
call first ###-#### walls ok; may resubmit for alternate work re 20% rule ( change different doors out at 2nd floor work area ) 8/30/2001 11:02:54 AM
|
BLD01-00809
| BLD-Conference | 8/29/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | A | PART |
|
|
###-#### w supt, need engs ok re pt deck, details for "shaft" 8/30/2001 5:02:05 PM
|
BLD00-03449
| BLD-Concrete | 8/29/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | A | PART |
|
|
concrete john -###-#### curbs at mech room roof deck, bar in place, MTI onsite. 8/30/2001 11:18:14 AM
|
BLD01-00214
| BLD-Conference | 8/29/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/29/2001 at 16:42:20. Contact: ###-####. need specify footing for ext walls;.. apparently was remodeled/added porch...bears roof. short landing ok at stairs due to exist. condition 8/30/2001 12:18:00 PM
|
BLD00-03549
| BLD-Conference | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/30/2001 9:09:26 AM w/ Dan re c/n of 8-14.
|
BLD01-00186
| BLD-Framing/Rough-in | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 340 On 8/30/2001 10:17:30 AM c/n, burn thru at top chords bar joists, need "fix"; discussed smoke barrierconst w/ framer
|
BLD01-01296
| BLD-Conference | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 8/30/2001 9:46:36 AM w/ 415 re "courtesy insp" c/n at site.
|
BLD01-01423
| BLD-Framing/Rough-in | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | P | FAIL |
|
|
fr scott ###-#### ; add: nails at spliced soffit joists, blocking at edge of mansard, bolts or equal at ledgers; seal req'd draft stops, obtain sprinkler rough in as needed at canopy, show all plans, recall 8/30/2001 4:59:20 PM
|
BLD00-03549
| BLD-Final | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 340 On 8/30/2001 10:20:15 AM
|
BLD01-00171
| BLD-Final | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 10:32:10. Contact: ###-####.
|
BLD01-02295
| BLD-Conference | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/30/2001 3:20:17 PM w/ bldr, need smoke dets at bedrooms & halls; battery ok at existing...insp req'd before cover.
|
BLD01-00171
| BLD-Conference | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/30/2001 3:50:10 PM ok to use new parts room w operational wet sprinklers at that area; ok per Joe T.
|
BLD00-01649
| BLD-Final | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by Inspector: 340 On 8/30/2001 9:10:12 AM , called in error, no final. 8/30/2001 9:14:46 AM
|
BLD00-03594
| BLD-Final | 8/30/2001 | 8/30/2001 | 8/30/2001 12:00:00 AM | P | PASS |
|
|
dan ###-#### ok for c/o, card at site. 8/30/2001 2:17:52 PM
|