MEC04-02251
| Pressure Test | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/27/2004 at 1:43:50 PM. Contact: ###-####.
|
BLD99-00702
| BLD-Final | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | PASS |
|
|
###-#### Checked With Troy (fire inspector)... and he said this has previously passed by Joe Tawney....... going to Doc final. 8/30/2004 4:29:13 PM
|
BLD04-01482
| BLD-Energy code compliance | 8/30/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/30/2004 at 6:10:59 AM. Contact: ###-####. frame corrections completed. 8/30/2004 2:49:12 PM
|
BLD04-01073
| BLD-Footing | 8/30/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/30/2004 at 8:35:15 AM. Contact: ###-####. Footings OK No special insp req. Not on plans....called engineer at Stapley ... Greg said 2500 PSI design. 8/30/2004 2:17:50 PM
|
BLD03-02785
| BLD-Final | 8/30/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | FAIL |
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Annette Moore Need Temp glass at Tub window. 8/30/2004 3:07:02 PM
|
BLD02-01451
| BLD-Final | 8/20/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | NR |
|
|
###-#### michelle Needs Electr final. 8/30/2004 3:40:08 PM
|