PLM04-01167
| Other | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | A | PART |
|
|
1:30 8/30/2004 9:34:25 AM conference with ken terrell about taking over job, check out 8/30/2004 2:27:42 PM fixturs for compliance and move water lines in duplex inside walls and hook up hose bib correctly and install trap adpt under lav. 8/30/2004 2:28:45 PM
|
PLM04-02485
| Water and/or Sewer | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | A | PASS |
|
|
###-#### paige sw final ok 8/30/2004 8:57:26 AM
|
PLM04-02486
| Water and/or Sewer | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | A | PASS |
|
|
###-#### paige sw final ok 8/30/2004 8:58:12 AM
|
PLM04-02484
| Sprinkler (Final) | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | A | CANC |
|
|
###-#### kevin
|
PLM04-02479
| Sprinkler (Final) | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | A | PASS |
|
|
###-#### ryan sp final ok 8/30/2004 8:57:56 AM
|
PLM04-02480
| Sprinkler (Final) | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | A | PASS |
|
|
###-#### ryan sp final ok tiein covered
8/30/2004 8:59:00 AM
|
PLM04-02476
| Sprinkler (Final) | 8/27/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | PASS |
|
|
tie in ok needs testing final ok with plugs in the test ports 8/30/2004 4:21:21 PM
|
PLM04-02495
| Sprinkler (Final) | 8/30/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | PASS |
|
|
###-#### kelly sp final ok with test ports plugged 8/30/2004 11:30:27 AM
|
PLM04-02498
| Water and/or Sewer | 8/30/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | PASS |
|
|
###-#### GREG sw final ok with water service bedded in clean fill 8/30/2004 1:27:48 PM
|
PLM04-01187
| Other | 8/30/2004 | 8/30/2004 | 8/30/2004 12:00:00 AM | P | PART |
|
|
2pm 2-4pm 8/30/2004 9:34:52 AM ri conference ok, tub s-trapped, vent shower, 1" tee above shutoff, roll clamps, fixture stops, etc. 8/30/2004 3:18:43 PM
|