ESC07-01118
| Site Preparation | 8/28/2007 | 8/30/2007 | 8/31/2007 11:59:00 AM | P | PART |
|
|
Verbal to rp; including lengthing lineal footage of wattles along Steward Gulch and modify the construction entrance so people are using it.
|
ESC06-01643
| BMP Violation | 8/30/2007 | 8/30/2007 | 8/30/2007 3:40:21 PM | P | DONE |
|
|
Site reviewed by J. Wylie of Public Works. Notice some minor amounts of materials on site. Materials could be used for installation of the debris fence and hay for barriers in the draw below the upper slope. Noticed that a drop inlet had been protected close to the driveway at Ginzel. Will follow up on progress.
|
ESC07-00866
| Site Final | 8/29/2007 | 8/30/2007 | 8/30/2007 11:37:03 AM | A | CANC |
|
|
Transfered to Inspector 436
|
ESC07-00973
| Site Final | 8/29/2007 | 8/30/2007 | 8/30/2007 11:36:49 AM | A | CANC |
|
|
Transfered to Inspector 436
|