FIR10-00607
| INSP-Final Inspection | 8/30/2011 | 8/30/2011 | 8/31/2011 4:44:31 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR11-00355
| INSP-Sprinkler Rough-in | 8/30/2011 | 8/30/2011 | 8/31/2011 4:41:17 PM | A | PART |
|
|
Reference stamped plan set for locations inspected today including the 1st floor restrooms east side, under stairway heads, and the 2nd floor classroom remodel.
|
BLD11-00351
| BLD-Conference | 8/25/2011 | 8/30/2011 | 8/31/2011 4:32:46 PM | P | DEFR |
|
|
|
BLD11-01562
| FIRE-Final Inspection | 8/30/2011 | 8/30/2011 | 8/30/2011 1:18:56 PM | P | PART |
|
|
Fire life safety final pending fire alarm system modifications necessary due to the remodel work. Visual notification must be extended to the new restroom. See activity notes and review comments for details. Temp. occupancy per R. Amandus okayed.
|
BLD11-01523
| FIRE-Final Inspection | 8/29/2011 | 8/30/2011 | 8/30/2011 1:13:39 PM | A | PASS |
|
|
Life safety finaled.
|