Inspections for the day of: Tuesday, August 30, 2011.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00263 FIR-Aging Inspection8/30/20118/30/20119/7/2011 10:29:48 AM NR
FIR09-00111 FIR-Aging Inspection8/30/20118/30/20119/7/2011 10:27:01 AM NR
Sid with Sundance is following up with this vendor since I'm holding up occupancy for a new tenant. This unfinished permit is one of the corrections required.
BLD07-02498 FIRE-Conference8/30/20118/30/20118/31/2011 1:48:49 PMPDONE
I spoke to an office manager about the status of this permit. Her and I walked back to verify the storage height and found that it still exceeded the maximum allowed height. She was going to get with her boss to get the situation resolved. I left her my business card and set up a follow up inspection for 9/9/2011.
BLD11-00101 FIRE-Final Inspection8/30/20118/30/20118/30/2011 4:15:23 PMPFAIL
All life safety items are passed except for two non-functioning emergency lights. One in the Southwest Stairwell and the other at the truck dock.
BLD11-01175 FIRE-Conference8/30/20118/30/20118/30/2011 4:13:54 PMPDONE
Noticed construction continuing with no fire inspection being called in. Stopped in to speak with the general contractor about possible fire sprinkler issues/requirements due to new combustible construction. I let the company owner know that he should consult with a sprinkler contractor on possible modifications prior to a fire lifesafety final.
BLD11-01683 FIRE-Conference8/30/20118/30/20118/30/2011 2:52:12 PMPDONE
Went over re-arranging the exit sign layout from the rear exit corridor with Bill
BLD11-01380 FIRE-Conference8/30/20118/30/20118/30/2011 2:51:08 PMPDONE
Went over re-arranging the exit sign layout from the rear exit corridor with Bill
FIR11-00376 INSP-Sprinkler Rough-in/Hydro8/29/20118/30/20118/30/2011 2:09:56 PMPFAIL

The 48" griddle power did not shut down upon activation of the suppression system. Gas and lighting did. Still need to also test the manual pull station.
BLD11-00366 FIRE-Final Inspection8/30/20118/30/20118/30/2011 1:35:01 PMPPASS
life safety passed.
BLD11-01889 FIRE-Final Inspection8/29/20118/30/20118/30/2011 11:55:18 AMAFAIL
See the city approved plans for corrections marked in red which include overspaced/missing sprinkler coverage, repair two exit signs, remove the thumbturn lock on the main exit door and provide for a passing inspection for the AES FIR permit that dates from 2009.
FIR11-00252 INSP-Final Inspection8/26/20118/30/20118/30/2011 10:10:05 AMAPASS
Permit finaled.
FIR11-00281 INSP-Final Inspection8/29/20118/30/20118/30/2011 10:09:20 AMAFAIL
As-builts have not been provided and an additional a/v is required in the fabric meeting room. End of line boltage calculations will need to be verified. Spacing was verified and two strobes adjusted on site. The devices have not been set off and tested for sync. yet.
FIR11-00427 INSP-Final Inspection8/29/20118/30/20118/30/2011 10:04:48 AMAFAIL
No access at the project site and I left message on Greg's voice mail. No inspection performed.
FIR11-00339 INSP-Final Inspection8/30/20118/30/20118/30/2011 9:06:01 AMACANC
requesting a final inspection. Please call Javier to schedule. Phone #: ###-#### >> Inspection requested via web by Trent Bice Inspection cancelled from web by: Trent Bice