ELE17-04174
| Final | 8/29/2018 | 8/30/2018 | 8/30/2018 12:33:36 PM | P | FAIL |
|
|
Rodrigo Phone #: ###-#### Exterior light does not work. 406.12. All receps in a dwelling unit shall be tamper resistant.(Bedroom and Bath GFCI)
|
ELE18-03155
| Final | 8/30/2018 | 8/30/2018 | 8/30/2018 12:17:50 PM | P | PASS |
|
|
Call home owner for entry ###-#### Phone #: ###-#### Inspection requested via web by Jesse Fuentes Final ok
|
ELE18-01206
| Electrical Rough-In | 8/29/2018 | 8/30/2018 | 8/30/2018 11:46:19 AM | A | PASS |
|
|
3rd floor raised flooring conduits, 2nd floor wall rough-in Contact Bryant Adams Thank you Phone #: ###-#### Inspection requested via web by Tom Betty 3rd floor raised flooring, 3rd floor restroom, Nothing on 2nd floor at this time rough in ok
|
ELE18-03292
| Electrical Rough-In | 8/29/2018 | 8/30/2018 | 8/30/2018 10:38:18 AM | A | PASS |
|
|
We need an underground inspection, Tobias is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker COnferance room floor box only ok to cover
|
MIS18-00330
| ELE-Conference | 8/29/2018 | 8/30/2018 | 8/30/2018 9:56:54 AM | A | FAIL |
|
|
Need obtain Occupancy & racking permit, possible ELE work without permits per J. Storey Phone #: ###-#### Work is being done without permits. Left notice and informed owner to have licensed electrician do the work.
|
ELE18-02655
| Final | 8/29/2018 | 8/30/2018 | 8/30/2018 9:21:30 AM | A | PASS |
|
|
Inspect kitchen remodel/Island.
* I am finished and I will be there at 8:00.
Thank you, Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Sorichta Final ok
|
ELE18-02072
| Electrical Rough-In | 8/29/2018 | 8/30/2018 | 8/30/2018 9:13:56 AM | A | PASS |
|
|
Joe Phone #: ###-#### Soffit was sheetrocked and walls were "1 sided" Walls and soffit only. rough in ok
|
ELE18-02517
| Final | 8/29/2018 | 8/30/2018 | 8/30/2018 8:48:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Quentin Hoffpaui Corections made final ok
|