PLM18-03721
| Water Heater Final | 8/30/2018 | 8/30/2018 | 8/30/2018 3:17:44 PM | P | CANC |
|
|
Please contact Bobby to schedule ###-#### Phone #: ###-#### Inspection requested via web by Scott Ferguson-Changed to tommorow.
|
PLM18-02541
| Plumbing Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 3:07:22 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Scott Hurren
|
PLM18-03719
| Groundwork | 8/30/2018 | 8/30/2018 | 8/30/2018 2:36:00 PM | P | PASS |
|
|
Mid to late afternoon if possible......thanks eric Inspection requested via web by Rob Bristol
|
PLM18-03276
| Water and/or Sewer | 8/29/2018 | 8/30/2018 | 8/30/2018 2:31:19 PM | P | PART |
|
|
Installation of 6in sewer at Bld 37. Ben Scott primary contact Phone #: ###-#### Inspection requested via web by Craig Fischer-Another 14' installed
|
MEC18-01068
| Conference | 8/29/2018 | 8/30/2018 | 8/30/2018 2:30:48 PM | P | PASS |
|
|
Rodrigo Phone #: ###-####
|
MEC18-01068
| DOC - Permit Finaled | 8/30/2018 | 8/30/2018 | 8/30/2018 2:30:38 PM | P | PASS |
|
|
|
PLM17-04916
| Final | 8/29/2018 | 8/30/2018 | 8/30/2018 2:30:26 PM | P | FAIL |
|
|
Rodrigo Phone #: ###-####-Cannot have an s-trap and need to caulk all fixtures.
|
MEC18-03489
| Rough-in | 8/30/2018 | 8/30/2018 | 8/30/2018 2:01:06 PM | P | PASS |
|
|
Field super; Daryl Thomas Phone #: ###-#### Inspection requested via web by Lisa Whitney
|
PLM18-02108
| Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 1:50:23 PM | P | PASS |
|
|
Restrooms, access via north east outside door by portapotty Phone #: ###-#### Inspection requested via web by Ben Taylor
|
PLM18-03598
| Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 12:54:03 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Smith-Base of stack cleanouts are required to be above the floor. Vent for upstairs shower needs to be downstream of trap. DWV and water test fail.
|
PLM18-03300
| Final | 8/29/2018 | 8/30/2018 | 8/30/2018 11:55:28 AM | A | FAIL |
|
|
Jeff Phone #: ###-####-Need to install a rpba on esspresso machine. Need to install a rpba on dishwasher. Need tempered water of 120 degree or less to public lav. Need installation instructions for grease trap. Need to install a dbca on ice machine or show that it has an air gap.
|
PLM18-03421
| Water Heater Final | 8/29/2018 | 8/30/2018 | 8/30/2018 11:27:52 AM | A | PASS |
|
|
Re-inspection Please call Molly Loayza ###-#### Phone #: ###-#### Inspection requested via web by Heidi Lukecart
|
PLM17-02583
| Final | 8/30/2018 | 8/30/2018 | 8/30/2018 10:50:55 AM | A | FAIL |
|
|
Room 361 Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Water not turned on to any fixtures.
|
PLM17-02587
| Final | 8/30/2018 | 8/30/2018 | 8/30/2018 10:45:23 AM | A | PART |
|
|
Room 221 Phone #: ###-#### Inspection requested via web by Joseph Corcoran-Room 221 pass.
|
PLM17-02582
| Final | 8/30/2018 | 8/30/2018 | 8/30/2018 10:41:08 AM | A | CANC |
|
|
Room 272 Phone #: ###-#### Inspection requested via web by Joseph Corcoran-There is no room 272.
|
PLM18-03715
| Final | 8/29/2018 | 8/30/2018 | 8/30/2018 10:26:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by chris thornburg
|
PLM18-01234
| Pressure Test | 8/30/2018 | 8/30/2018 | 8/30/2018 10:17:46 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-60 lb gas test in area D pass.
|
PLM18-01263
| Storm Drains | 8/29/2018 | 8/30/2018 | 8/30/2018 10:17:07 AM | A | PART |
|
|
Come and inspect WYE as early as possible. Thank you. Phone #: ###-#### Inspection requested via web by JD Borges-Last correction to replace tee with directional fitting has been fixed.
|
PLM18-01234
| Roof Drains | 8/30/2018 | 8/30/2018 | 8/30/2018 10:15:56 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Roof drains area d pass.
|
PLM18-03065
| Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 9:46:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol
|
PLM18-03711
| Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 9:15:21 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Steve Spence-Can only have 4 fixture units on a 2" section of a horizontal wet vent. DWV test fail. (3" in overhead. Can not paint a fitting with glue to fix a leak.) Missing all nailplates.
|
PLM18-03276
| Water and/or Sewer | 8/29/2018 | 8/30/2018 | 8/30/2018 8:32:40 AM | A | PART |
|
|
Installation of 6in sewer at Bld 37. Ben Scott primary contact Phone #: ###-#### Inspection requested via web by Craig Fischer-80 ' of 6" sewer installed so far.
|
PLM18-03437
| Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 8:15:46 AM | P | CANC |
|
|
JOB # 19893 Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes Inspection cancelled from web by: Ann Marie Reyes
|
PLM18-02524
| Plumbing Rough-in | 8/29/2018 | 8/30/2018 | 8/30/2018 8:15:42 AM | P | CANC |
|
|
JOB # 19775 Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes Inspection cancelled from web by: Ann Marie Reyes
|
PLM18-03490
| Water and/or Sewer | 8/29/2018 | 8/30/2018 | 8/30/2018 8:01:12 AM | A | PASS |
|
|
Vicky Phone #: ###-####
|
PLM18-03490
| DOC - Permit Finaled | 8/30/2018 | 8/30/2018 | 8/30/2018 8:01:01 AM | P | PASS |
|
|
|
PLM18-01909
| Final | 8/30/2018 | 8/30/2018 | 8/30/2018 6:27:14 AM | A | PASS |
|
|
|
PLM18-01234
| Med/Gas Systems | 8/29/2018 | 8/30/2018 | 8/30/2018 6:23:29 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03468
| PLM-Aging Inspection | 8/30/2018 | 8/30/2018 | 8/30/2018 6:21:59 AM | | PEND |
|
|
No calls
|
PLM17-03447
| PLM-Aging Inspection | 8/30/2018 | 8/30/2018 | 8/30/2018 6:21:29 AM | | FAIL |
|
|
No calls
|