ELE19-02718
| Final | 8/29/2019 | 8/30/2019 | 8/30/2019 3:02:24 PM | P | FAIL |
|
|
Would like to get a general Electricial final for the building with exception to the paint booth. Still waiting for some solenoid air switches and fire suppression system Phone #: ###-#### Inspection requested via web by Keith Chetta NEC516.4 Area Classification. Compressor branch circuit and light switch installed in Class 1 Division 1 hazardous locations, designated paint storage area
|
ELE19-03277
| Permanent Service | 8/30/2019 | 8/30/2019 | 8/30/2019 2:00:30 PM | P | PASS |
|
|
p/s u/g rec ok
|
ELE19-03253
| Temporary Service | 8/30/2019 | 8/30/2019 | 8/30/2019 10:46:07 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bonnie Page t/s o/h n ok
|
ELE16-00483
| ELE-Aging Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 10:38:31 AM | | DONE |
|
|
Contacted contractor who agreed to set up final inspection
|
ELE19-00374
| Final | 8/29/2019 | 8/30/2019 | 8/30/2019 9:44:24 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Final ok
|
ELE19-03259
| Final | 8/29/2019 | 8/30/2019 | 8/30/2019 9:17:49 AM | A | PASS |
|
|
we roughed and trimmed out at same time hopefully a final is ok Phone #: ###-#### Inspection requested via web by Jay Hutchison Detached garage w/ sub panel Final ok
|
ELE17-01963
| ELE-Aging Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 8:17:00 AM | | PASS |
|
|
see final
|
ELE17-01963
| Final | 8/30/2019 | 8/30/2019 | 8/30/2019 8:16:42 AM | P | PASS |
|
|
job complete, Final ok
|