Inspections for the day of: Thursday, August 31, 2000.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02329 BLD-Conference8/30/20008/31/20008/31/2000 12:00:00 AMAPASS
###-#### Rocky call first
conf. on beam, wall , bearing,, etc. 8/31/2000 12:39:30 PM
BLD99-03662 BLD-Framing/Rough-in8/30/20008/31/20008/31/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/30/2000 at 11:47:25. Contact: ###-####.
c/n posted , int. shear panel nailing, need mechanical rough 8/31/2000 10:23:03 AM
BLD99-03660 BLD-Wall cover8/30/20008/31/20008/31/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/30/2000 at 12:49:52. Contact: ###-####.
ok to rock, need to see nailing on sheetrock for shear 8/31/2000 10:25:18 AM
BLD99-03661 BLD-Wall cover8/30/20008/31/20008/31/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/30/2000 at 12:51:12. Contact: ###-####.
ok to sheetrock ,, need to see nailing on sheetrock for shear 8/31/2000 10:26:20 AM
BLD00-02151 BLD-Framing/Rough-in8/30/20008/31/20008/31/2000 12:00:00 AMACANC
Mike Cook ###-####
done by 340 8/31/2000 8:56:30 AM
BLD00-00141 BLD-Framing/Rough-in8/30/20008/31/20008/31/2000 12:00:00 AMAPART
shear nail bob ###-####
outside shear ok,,, ok to side 8/31/2000 9:59:42 AM
BLD00-02127 BLD-Framing/Rough-in8/30/20008/31/20008/31/2000 12:00:00 AMANR
ceiling grid
BLD99-03669 BLD-Framing/Rough-in8/31/20008/31/20008/31/2000 12:00:00 AMAPART
Scheduled by Inspector: 415 On 8/31/2000
c/n posted , draft stops,,,,,ok to insulate and to put inside shear o.s.b. on 8/31/2000 4:21:04 PM
BLD00-02174 BLD-Foundation8/30/20008/31/20008/31/2000 12:00:00 AMPPART
Don ###-####
ok w/ verbal corrections, work in progress, ok to have 3 hold downs in each shear wall as long as they are eqiv. to req. uplift. 8/31/2000 2:06:12 PM
BLD00-01549 BLD-Final8/31/20008/31/20008/31/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/31/2000 at 07:34:22. Contact: ###-####.
c/n left, seal vents, firewall and clean under dryer vent. 8/31/2000 4:00:41 PM
BLD00-02120 BLD-Footing8/31/20008/31/20008/31/2000 12:00:00 AMPFAIL
###-#### ft insp
need engineer letter on soil, all else appears ok 8/31/2000 2:00:14 PM
BLD00-01205 BLD-Final8/31/20008/31/20008/31/2000 12:00:00 AMPPASS
Wynn ###-####
BLD00-01086 BLD-Foundation8/31/20008/31/20008/31/2000 12:00:00 AMPNR
FOUND & SHEAR INSP--###-####--YON
ok to pour footings, shear walls not ready 8/31/2000 4:09:56 PM
BLD00-00425 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00428 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00416 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00429 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00418 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00417 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00427 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00426 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####
BLD00-00424 BLD-Footing8/30/20008/31/20008/31/2000 12:00:00 AMPPART
bill ###-####