PLM01-01733
| PLM-Aging Inspection | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | | NR |
|
|
|
PLM01-02338
| Final | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PART |
|
|
fn insp jim ###-####
|
PLM01-01418
| Final | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 13:02:35. Contact: ###-####.
|
PLM01-01236
| Plumbing Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 8/30/2001 2:18:12 PM 11:00 iw copper pumped side of t 8/31/2001 11:47:11 AM e copper slurry test ok 8/31/2001 11:47:23 AM
|
PLM01-02997
| Sprinkler (Final) | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PASS |
|
|
###-#### dan
|
PLM01-02847
| Plumbing Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | NH |
|
|
###-#### DAVID no access or answer at phone number 8/31/2001 8:48:41 AM
|
PLM01-03002
| Sprinkler (Final) | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | FAIL |
|
|
###-#### expose connections to water service 8/31/2001 10:36:59 AM
|
PLM01-02586
| Water and/or Sewer | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 06:44:10. Contact: ###-####.
|
PLM01-02977
| Plumbing Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
###-#### CARLOS gw ok 8/31/2001 3:25:46 PM
|
PLM01-02892
| Water and/or Sewer | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 15:22:49. Contact: ###-####.
|
PLM01-00538
| Final | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 09:57:18. Contact: ###-####. install r.p. on water line serving roof top units, thermol expantion protection required, test all backflow preventors, sewer pump station must be operational prior to perm. occ. 8/31/2001 4:12:17 PM
|
PLM01-02989
| Water and/or Sewer | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
###-#### bruce water only ok to cover from meter to building test ok , ok to cover from building to wash building after test, will witness test on tuesday. 8/31/2001 2:55:12 PM
|
PLM01-01605
| Plumbing Rough-in | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
###-#### ROUL hangers on rd's 8/31/2001 1:45:51 PM
|
PLM01-02338
| Water and/or Sewer | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 8/31/2001 10:55:00 AM needs to set the mh's to grade and flush 8/31/2001 2:53:34 PM
|
PLM01-02847
| Plumbing Rough-in | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PASS |
|
|
###-#### MEL
|