ELE01-03079
| Permanent Service | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PASS |
|
|
###-#### ANDY p/s ug n ok 8/31/2001 9:21:59 AM
|
ELE01-02432
| Electrical Rough-In | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | FAIL |
|
|
MIKE ###-#### 300-4 wire with in 1 1/4" /electrode conducter passing through rig nipple , not choked off at both ends /not all grds made up/ no tails for switches 8/31/2001 12:25:55 PM
|
ELE01-02294
| Final | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 11:34:08. Contact: ###-####.
|
ELE01-01633
| Electrical Rough-In | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PASS |
|
|
TOM CELL ###-####
|
ELE01-03072
| Rough-In Permanent Service | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 16:06:23. Contact: ###-####. temp/occup 8/31/2001 1:09:27 PM--- CANCEL PER JOE RAY
|
ELE01-02786
| Final | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 08:05:41. Contact: ###-####. no access /called contr 8/31/2001 2:26:46 PM
|
ELE01-00365
| Final | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/31/2001 at 11:01:06. Contact: ###-####. temp/occup 8/31/2001 1:51:24 PM
|
ELE01-03072
| Rough-In Permanent Service | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PASS |
|
|
R/I & SER p/s ug n ok 8/31/2001 2:21:51 PM
|