Inspections for the day of: Friday, August 31, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01329 BLD-Final8/28/20018/31/20018/31/2001 12:00:00 AMAPASS
Dave ###-####. house is gone and lot is clean. 8/31/2001 9:49:17 AM
BLD01-01561 BLD-Final8/29/20018/31/20018/31/2001 12:00:00 AMAPASS
###-####
BLD01-00737 BLD-Framing/Rough-in8/30/20018/31/20018/31/2001 12:00:00 AMAPART
###-####. looked at some interior upper section of wall shear panels only. 8/31/2001 12:30:09 PM
BLD01-00739 BLD-Final8/30/20018/31/20018/31/2001 12:00:00 AMAFAIL
###-####.needs fire/life safety signed for a temp, other required signatures have been signed, also i have c/n posted fory 8/31/2001 11:35:20 AMexterior hc ramp hand rails to be installed ,and other items a noted on posted c/n at the site. NOT approved for occupancy at this time. 8/31/2001 11:36:24 AM
BLD00-03498 BLD-Final8/30/20018/31/20018/31/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/30/2001 at 12:39:31. Contact: ###-####. left a c/n to fire/caulk over exposed rock wool at roof joist at 1 hour fire wall shop/spray room side only. all othEr items for perm oc have been resolved/signed approved. 8/31/2001 10:10:35 AM
BLD01-01942 BLD-Final8/30/20018/31/20018/31/2001 12:00:00 AMAPASS
Dave ###-####. ok for perm oc or completion. 8/31/2001 11:46:59 AM
BLD01-00117 BLD-Foundation8/30/20018/31/20018/31/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/30/2001 at 18:11:39. Contact: ###-####.
BLD01-01557 BLD-Framing/Rough-in8/30/20018/31/20018/31/2001 12:00:00 AMACANC
fr insp- bernard-- mall does not open until 10--###-####. needs to talk with 408. 8/31/2001 1:18:54 PM
MEC01-02565 Pressure Test8/30/20018/31/20018/31/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 08/30/2001 at 17:02:20. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/31/2001 at 09:12:23.
BLD01-01695 BLD-Concrete8/31/20018/31/20018/31/2001 12:00:00 AMPPART
###-#### jim. subject to s-i tilt up wall. 8/31/2001 2:29:05 PM
BLD01-00588 BLD-Final8/31/20018/31/20018/31/2001 12:00:00 AMPPART
###-####ok temp oc c/n posted for other items. 8/31/2001 3:54:22 PM
BLD01-00588 BLD-Conference8/31/20018/31/20018/31/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 08/31/2001 at 08:39:10. Contact: ###-####.
BLD00-02820 BLD-Framing/Rough-in8/31/20018/31/20018/31/2001 12:00:00 AMPPART
###-#### JOHN ok to insulate c/n. 8/31/2001 4:12:09 PM
BLD01-00739 BLD-Final8/31/20018/31/20018/31/2001 12:00:00 AMPPART
Scheduled by Inspector: 407 On 8/31/2001 2:54:13 PM ok temp oc c/n posted with contractor. 8/31/2001 4:10:16 PM
BLD01-00717 BLD-Concrete8/30/20018/31/20018/31/2001 12:00:00 AMPPART
terry -###-####- concrete 2nd lift of block at non structural in-fill has been poured appears ok all cells grouted. 8/31/2001 4:08:48 PM