BLD01-01474
| BLD-Aging Inspection | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | | PASS |
|
|
exp. 11-01 8/31/2001 10:38:39 AM
|
BLD01-00846
| BLD-Framing/Rough-in | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 415 On 8/31/2001 9:20:54 AM shop framing ok, need to see int. shear later
|
BLD01-02212
| BLD-Conference | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PASS |
|
|
shear on carport ok, also conf. on attaching front porch, ok to lag straps through multiple layers of roofing into rafters for sole plate for rafters. 8/31/2001 11:50:12 AM
|
BLD00-02884
| BLD-Final | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | FAIL |
|
|
Jeff ###-####
c/n posted 8/31/2001 10:20:42 AM
|
BLD01-01056
| BLD-Foundation | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PART |
|
|
###-####
grout already done, pending s. i. reports 8/31/2001 11:51:38 AM
|
BLD01-00846
| BLD-Framing/Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PART |
|
|
fr bill ###-####--shear nail
only part of int. shear done, need to see the rest of int. of duplex later 2day, and shop int. shear 8/31/2001 9:18:30 AM
|
BLD01-01334
| BLD-Final | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 15:50:00. Contact: ###-####.
c/n posted 8/31/2001 11:40:30 AM
|
BLD01-02204
| BLD-Footing | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PART |
|
|
###-#### CHRIS
basement ftgs and int. point loads/ftgs 8/31/2001 10:33:21 AM
|
BLD01-02358
| BLD-Footing | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | FAIL |
|
|
ft insp- dave ###-####
not ready 8/31/2001 9:36:18 AM
|
BLD01-01866
| BLD-Foundation | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | A | PART |
|
|
kim- ###-####- found
wip, ok w/ verbal corrections, also need to verify ground clearance to framing 8/31/2001 9:26:57 AM
|
BLD01-00976
| BLD-Framing/Rough-in | 8/30/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 15:08:35. Contact: ###-####.ext. shear ok w/ verbal corrections 8/31/2001 1:00:19 PM
|
BLD01-02358
| BLD-Footing | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
reinspect ftgs 8/31/2001 9:33:40 AM
ok w/ verbal corrections 8/31/2001 1:58:08 PM
|
BLD00-02884
| BLD-Final | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
jeff ###-####///code 9989 8/31/2001 9:35:31 AMc/n posted on natural light 1203 ubc, other items will be ok 8/31/2001 3:31:24 PM
|
MEC01-01151
| Final | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PASS |
|
|
ok per 411 8/31/2001 1:38:59 PM
|
BLD01-02337
| BLD-Energy code compliance | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
slab insulation ok 8/31/2001 1:30:43 PM
|
BLD01-00846
| BLD-Other | 8/31/2001 | 8/31/2001 | 8/31/2001 12:00:00 AM | P | PART |
|
|
int. shear on duplex ok, wip 8/31/2001 3:25:25 PM
|