Inspections for the day of: Friday, August 31, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01841 BLD-Wall cover8/29/20018/31/20018/31/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/29/2001 at 07:08:15. Contact: ###-####. hold downs are installed on colmns still need to finish screwing to post steve will check them this afternoon 8/31/2001 8:47:16 AM
MEC01-02605 Final8/30/20018/31/20018/31/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/30/2001 at 11:44:49. Contact: ###-####.
BLD00-03729 BLD-Other8/30/20018/31/20018/31/2001 12:00:00 AMADONE
column and masonary inspection Bruce ###-#### done using spec inspection 8/31/2001 11:56:30 AM
BLD01-01508 BLD-Framing/Rough-in8/30/20018/31/20018/31/2001 12:00:00 AMAFAIL
Jeff ###-#### reinspection c/n on site ok to insulate 8/31/2001 10:37:35 AM
BLD01-00522 BLD-Final8/30/20018/31/20018/31/2001 12:00:00 AMAFAIL
Terry ###-#### c/n on site ok to insulate 8/31/2001 10:14:36 AM
BLD01-02329 BLD-Framing/Rough-in8/30/20018/31/20018/31/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/30/2001 at 14:13:44. Contact: ###-####.
MEC01-01685 Final8/30/20018/31/20018/31/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/30/2001 at 17:09:27. Contact: ###-####.
BLD01-00522 BLD-Final8/31/20018/31/20018/31/2001 12:00:00 AMAFAIL
Added by Inspector: 425 On 8/31/2001 10:38:55 AM need to insulate all ext outlet boxes
MEC01-02605 Pressure Test8/31/20018/31/20018/31/2001 12:00:00 AMAPASS
Added by Inspector: 425 On 8/31/2001 10:59:09 AM
BLD01-02043 BLD-Framing/Rough-in8/31/20018/31/20018/31/2001 12:00:00 AMPFAIL
shear wall- jay ###-#### c/n on site city appr plans missing panels I added panels as needed to get tocode min crew also needs blocking at top of all panels 8/31/2001 3:09:02 PM
BLD01-01400 BLD-Energy code compliance8/30/20018/31/20018/31/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/30/2001 at 17:57:25. Contact: ###-####.
BLD01-01562 BLD-Framing/Rough-in8/30/20018/31/20018/31/2001 12:00:00 AMPFAIL
###-#### c/n on site 8/31/2001 2:44:21 PM
BLD01-01732 BLD-Energy code compliance8/29/20018/31/20018/31/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/29/2001 at 07:06:09. Contact: ###-####. c/n on site 8/31/2001 3:39:16 PM