Inspections for the day of: Friday, August 31, 2007.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00598 INSP-Final Inspection8/31/20078/31/20078/31/2007 3:32:37 PMPFAIL
This project is not ready for a final due to the approved drawings not being available on site. The sprinkler piping at the old connecting walkway is ok to cover.
BLD07-02377 FIRE-Final Inspection8/31/20078/31/20078/31/2007 2:51:16 PMPFAIL
Repair the emergency lights in the kitchen.
FIR05-00536 INSP-Final Inspection8/31/20078/31/20078/31/2007 2:49:57 PMPCANC
See inspection request for this morning for inspection notes.
FIR06-00011 INSP-Alarm Testing8/30/20078/31/20078/31/2007 2:19:42 PMPDONE
I tested the firemans phone for functionality from the penthouse to the fourth floor. One phone jack is missing on the 9th floor and we missed testing one in the elevator equipment room.
BLD07-00913 FIRE-Final Inspection8/30/20078/31/20078/31/2007 2:17:56 PMAFAIL
See the front page of the city approved plans for the correction list. They include the installation of the exit sign in the east portion of the building, foam covers for the duct detector sample tubes, a map at the facp, move the address as per the plans, provide the "Inspectors Test" sign and reduce the storage in the warehouse.
BLD07-01201 FIRE-Final Inspection8/30/20078/31/20078/31/2007 2:14:18 PMAPART
Tenant space 10464 is ok to cover. The second tenant space did not have all of the insulation backing held to the roof deck as agreed.
FIR07-00479 INSP-Sprinkler Rough-in8/30/20078/31/20078/31/2007 2:10:23 PMAPASS
The remaining exposed piping is ok to cover. The contractor owes me an as-built plan as per the scope of work. After canopies and ceiling tile have been verified this project can be finaled
FIR05-00536 INSP-Final Inspection8/30/20078/31/20078/31/2007 12:39:28 PMAFAIL
There are many rooms that are missing ceiling tile and are locked with no access to inspect. Project was not ready for inspection.
FIR06-00813 INSP-Conference8/29/20078/31/20078/31/2007 12:24:17 PMADONE
The fire alarm contractor wanted to know the specifics of why I can't dedicate specific times to show up and spend doing their inspection.
BLD07-01969 FIRE-Final Inspection8/30/20078/31/20078/31/2007 11:36:27 AMAFAIL
Repair the exit signs and emergency light including the exit corridor at the restrooms.
BLD06-00714 FIRE-Final Inspection8/30/20078/31/20078/31/2007 11:10:59 AMAPART
This inspection was for 5237 only. It is ok with me to occupy. No signature was given since the scope of work was for four condo's.
FIR07-00539 INSP-Alarm Testing8/30/20078/31/20078/31/2007 11:08:09 AMAPASS
Permit finaled
FIR07-00642 INSP-Sprinkler Rough-in8/30/20078/31/20078/31/2007 8:11:17 AMAPASS
This rough to cover is for areas 7&8. Piping is ok to cover. See the city approved plans for the location with todays date.