ELE07-00642
| Final | 8/31/2007 | 8/31/2007 | 8/31/2007 5:35:45 PM | P | PASS |
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Hattie James . 1. final ok. .
|
ELE07-02547
| Final | 8/31/2007 | 8/31/2007 | 8/31/2007 5:35:04 PM | P | FAIL |
|
|
Contact is Perry. Final inspection for Bakery Dept. only. Phone #: ###-#### Internet Inspection Request from: David Bonner . 1. low voltage cable on grid. . . 2. 120volt outlets not gfci protected. .
|
ELE07-01738
| Conference | 8/30/2007 | 8/31/2007 | 8/31/2007 4:26:50 PM | P | DONE |
|
|
brent; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt . 1. Needs to read some books and then draw up what he wants to do. At that time he will call for another confrence to discuss his plans. .
|
ELE07-01551
| Electrical Rough-In | 8/29/2007 | 8/31/2007 | 8/31/2007 3:22:11 PM | P | DONE |
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Hattie James; common area, first and second floors; reinspect 1. This was a final inspection, see the results for this on the final for this date.
|
ELE07-01551
| Final | 8/31/2007 | 8/31/2007 | 8/31/2007 3:20:56 PM | P | PART |
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Hattie James; common area, first and second floors; reinspect . 1. Panel schedules needed. . . 2. Outlet needed in laundry room, and back office. . . 3. J-Box covers needed in various areas. . . 4. Joe has a list for the location of each of the violations. . . 5. Notice posted on window in the lobby.
|
ELE07-02415
| Final | 8/30/2007 | 8/31/2007 | 8/31/2007 1:50:04 PM | P | PASS |
|
|
Clyde; Phone #: ###-#### Internet Inspection Request from: Hattie James . 1. final ok. .
|
ELE07-02302
| Electrical Rough-In | 8/31/2007 | 8/31/2007 | 8/31/2007 1:07:15 PM | P | PASS |
|
|
Contact: Steve Hess - underground inspection please Phone #: ###-#### Internet Inspection Request from: Deb Gooden . 1. as noted on prints ok. .
|
ELE07-02311
| Final | 8/31/2007 | 8/31/2007 | 8/31/2007 12:47:48 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/31/2007 at 7:08:32 AM. Contact: ###-####. . 1. final ok. .
|
ELE07-01691
| Electrical Rough-In | 8/30/2007 | 8/31/2007 | 8/31/2007 12:07:21 PM | A | FAIL |
|
|
south tower, first floor; ceiling; Bud; Phone #: ###-#### Internet Inspection Request from: Hattie James 1. still needs to clean up the lv cables.
|
ELE07-02684
| Final | 8/30/2007 | 8/31/2007 | 8/31/2007 10:24:58 AM | A | PART |
|
|
###-#### Internet Inspection Request from: Todd Holbrook . 1. need to verify grounding, its all that is left. .
|
ELE07-02684
| Permanent Service | 8/30/2007 | 8/31/2007 | 8/31/2007 10:23:23 AM | A | PART |
|
|
###-#### Internet Inspection Request from: Todd Holbrook . 1. need to verify concrete encased electrode. .
|
ELE07-02931
| Electrical Rough-In | 8/30/2007 | 8/31/2007 | 8/31/2007 9:50:27 AM | A | PASS |
|
|
rough in inspection for remodel and new addition. any questions call George @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose . 1. ri ok. .
|
ELE07-02547
| Rough-In Permanent Service | 8/31/2007 | 8/31/2007 | 8/31/2007 9:32:24 AM | A | FAIL |
|
|
Contact is Perry. Please inspect Bakery for final. Phone #: ###-#### Internet Inspection Request from: David Bonner . 1. must remove cieling tiles for inspection. .
|
ELE07-03039
| Electrical Rough-In | 8/30/2007 | 8/31/2007 | 8/31/2007 9:21:12 AM | A | PASS |
|
|
Underground inspection please-louis ###-#### . 1. underground ok. . . 2. bond wire for light fixture ok. .
|
ELE07-03051
| Electrical Rough-In | 8/30/2007 | 8/31/2007 | 8/31/2007 8:57:36 AM | A | PASS |
|
|
###-#### greg . 1. ri ok. .
|