PLM09-00581
| PLM-Aging Inspection | 8/31/2009 | 8/31/2009 | 9/2/2009 5:06:00 PM | | PART |
|
|
need backflows tested..........ds
|
GCP09-00002
| GCP-Water and/or Sewer | 8/31/2009 | 8/31/2009 | 8/31/2009 4:51:29 PM | P | PEND |
|
|
time on job adjusted......ds dcva's need tested inside still.........ds
|
GCP09-00002
| GCP-Water and/or Sewer | 8/31/2009 | 8/31/2009 | 8/31/2009 4:47:18 PM | P | PART |
|
|
gary Phone #: ###-#### water service ok...........dcva's need to be retested for final...........ds
|
PLM09-01443
| Sprinkler (Final) | 8/31/2009 | 8/31/2009 | 8/31/2009 3:25:44 PM | P | PASS |
|
|
Brian Phone #: ###-#### no backflow installed at this time....will need a rp if connected to well at a later time and repermitted.............ds
|
GCP09-00003
| GCP-Water and/or Sewer | 8/31/2009 | 8/31/2009 | 8/31/2009 3:10:10 PM | P | FAIL |
|
|
jim Phone #: ###-#### food prep sinks shall be indirectly wasted.......2003 UPC 801.2.3............ds..
|
PLM09-01444
| Groundwork | 8/31/2009 | 8/31/2009 | 8/31/2009 2:33:55 PM | P | PASS |
|
|
Please call Matt with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
GCP09-00003
| GCP-Water and/or Sewer | 8/31/2009 | 8/31/2009 | 8/31/2009 11:15:32 AM | A | PART |
|
|
need a full size 4" end of line clean out.........ds
|
PLM09-00711
| PLM-Aging Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 11:10:04 AM | | NR |
|
|
wip
|
PLM09-00710
| PLM-Aging Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 11:08:56 AM | | NR |
|
|
wip
|
ESC09-00046
| Random Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 10:23:27 AM | A | PASS |
|
|
bmp's and concrete dump in place.site clean............ds
|
PLM09-01441
| Plumbing Rough-in | 8/28/2009 | 8/31/2009 | 8/31/2009 9:29:47 AM | A | PASS |
|
|
Internet Inspection Request from: Ina Schneider
|