ESC09-00523
| Random Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 3:55:02 PM | P | CANC |
|
|
wrong esc number on sign, rp needs to verify, called to have rp check out
|
ESC08-00457
| General Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 3:51:16 PM | P | PASS |
|
|
looked ok
|
ESC09-00426
| General Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 3:50:08 PM | P | PART |
|
|
called, no answer, asked form setters to call rp to put up sign
|
ESC05-01218
| General Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 3:46:03 PM | P | PASS |
|
|
looked ok, can't final until corrections made for electrical
|
ESC09-00467
| Random Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 3:36:19 PM | P | DONE |
|
|
see 301 comments
|
ESC09-00468
| Random Inspection | 8/31/2009 | 8/31/2009 | 8/31/2009 3:13:39 PM | P | DONE |
|
|
see comments per 301
|
ELE08-02536
| Electrical Rough-In | 8/31/2009 | 8/31/2009 | 8/31/2009 3:02:00 PM | P | PART |
|
|
Requesting inspection of 6 pole bases. Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to pour pole bases only, contractor to uncover u/g to inspect for conduit bends, backfill material, conduit depth, spacing
|
ELE09-01623
| Temporary Service | 8/31/2009 | 8/31/2009 | 8/31/2009 2:08:13 PM | P | FAIL |
|
|
ron Phone #: ###-#### called , lef tcorrection notice, NEC 408.4 shall provide clear and concise circuit directory, 406.8(B) all 15 abd 20a receptacles shall be listed weather resistant type, 110.12(B) internal parts shall not be contaminated with foreign material, BCC jod id sticker shall be posted, fee due
|
ELE09-01599
| Final | 8/28/2009 | 8/31/2009 | 8/31/2009 11:14:05 AM | A | FAIL |
|
|
TED Phone #: ###-#### called, left correction notice, NEC 250.94 shall provide intersystem bonding connection termination, 210.8(A) shall provide gfci protection for garage and outdoor receptacles, 110.26(A) shall provide workspace and clear space at panel and meter,210.52(C)(1) shall provide countertop receptacles such that no point is over 24" from receptacle 406.11 all receptacles shall be tamper-resistant 406.4(D) receptacle faces shall be flush with or project from faceplates, 422.10(A) a/c branch circuit shall not exceed listed requirements for overcurrent protection, 110.22 shall label disconnects, 225.31 shall provide disconnect at garage per 225.36, BCC shall install dishwasher for final, shall see u/g at garage
|
ELE09-01378
| Final | 8/28/2009 | 8/31/2009 | 8/31/2009 9:58:04 AM | A | FAIL |
|
|
Contact is Darby Talbot Phone #: ###-#### Internet Inspection Request from: Shelli Daylong met contractor, left correction notice, NEC 210.63 shall provide 125v, single phase 15 or 20a 5receptacle within 25' of hvac equipment, 210.62 shall provide showroom receptacles, 210.8(B)(5) receptacles within 6' of sink shall be gfci protected, 408.4 panel schedules shall be clear, concise and direct, 400.8 shall not use cord for substitue for fixed wiring of structure, no esc this project
|
ELE09-00773
| Final | 8/28/2009 | 8/31/2009 | 8/31/2009 8:59:50 AM | A | FAIL |
|
|
Mike Phone #: ###-#### called ,left message, left correction notice, NEC 210.63 shall provide 125v, single phase 15 or 20a receptacle within 25' of hvac equipment, 210.62 shall provide showroom receptacles, 210.8(B)(5) receptacles within 6' of sink shall be gfci protected, 408.4 panel schedules shall be clear, concise and direct, 400.8 shall not use cord for substitute of fixed wiring for structure, no esc this project
|