MEC10-02174
| Conference | 8/31/2010 | 8/31/2010 | 9/1/2010 12:03:36 PM | A | PASS |
|
|
need to call margie and have her schedule this for an inspection...she will schedule the inspection
|
MEC10-02226
| Conference | 8/31/2010 | 8/31/2010 | 9/1/2010 12:02:58 PM | A | PASS |
|
|
need to call margie and get phone # so i can do inspection...talked to her and she will schedule for inspection
|
MEC10-02647
| Rough-in | 8/30/2010 | 8/31/2010 | 8/31/2010 5:31:09 PM | P | FAIL |
|
|
>> Inspection requested via web by Stephanie Brown...bad guage...screw penetrating inner liner of b-vent..shield b-vent in attic..what are those 3" and 5" ducts penetrating the roof at furn/wh for??
|
MEC10-02657
| Final | 8/30/2010 | 8/31/2010 | 8/31/2010 5:29:09 PM | P | NH |
|
|
Please call before arrving, thanks Phone #: ###-#### >> Inspection requested via web by Tom Soniville..rescheduled for wed am
|
MEC10-02626
| Rough-in | 8/31/2010 | 8/31/2010 | 8/31/2010 4:05:42 PM | P | PASS |
|
|
Ollie Phone #: ###-####
|
MEC10-02664
| Final | 8/31/2010 | 8/31/2010 | 8/31/2010 3:32:36 PM | P | PASS |
|
|
Homeowner will be home all afternoon Phone #: ###-#### >> Inspection requested via web by Bill Burch
|
MEC09-01942
| Final | 8/31/2010 | 8/31/2010 | 8/31/2010 3:21:07 PM | P | PASS |
|
|
Don-PLease call at least 30 mins prior to inspection for open access Phone #: ###-####
|
MEC10-02612
| Final | 8/30/2010 | 8/31/2010 | 8/31/2010 2:47:03 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Shannon Wells
|
MEC10-02651
| Final | 8/30/2010 | 8/31/2010 | 8/31/2010 12:16:13 PM | A | PART |
|
|
Pressure test only as late in the morning as possible. Thanks, April. Phone #: ###-#### >> Inspection requested via web by April Sims...20lb gas to range and future w/h ok...they are going to have you add the duct on to your permit (range)
|
MEC10-02175
| Conference | 8/31/2010 | 8/31/2010 | 8/31/2010 11:33:20 AM | A | PEND |
|
|
called michelle and ask her to schedule this for an inspection
|
MEC10-02177
| Conference | 8/31/2010 | 8/31/2010 | 8/31/2010 11:32:52 AM | A | PASS |
|
|
need to call contractor and have them schedule this for an inspection...talked to katie and they are waiting on the meter bar
|
MEC10-02315
| Conference | 8/31/2010 | 8/31/2010 | 8/31/2010 11:19:27 AM | A | PEND |
|
|
called Harold and ask him to call me with the home owners phone #, so i can final this .
|
MEC10-02237
| Conference | 8/31/2010 | 8/31/2010 | 8/31/2010 11:19:10 AM | A | PASS |
|
|
need to call contractor and have him schedule an inspection..tony already approved a structural r/i......he said it will all be visible at final
|
MEC10-02327
| Final | 8/26/2010 | 8/31/2010 | 8/31/2010 10:52:43 AM | A | PASS |
|
|
Please call before arriving, thanks Phone #: ###-#### >> Inspection requested via web by Tom Soniville
|
GCM09-00058
| GCM-Final | 8/30/2010 | 8/31/2010 | 8/31/2010 10:52:12 AM | A | NH |
|
|
chad ###-####...wasn't home so the contractor will reschedule for wed am
|
GCM10-00154
| GCM-Final | 8/30/2010 | 8/31/2010 | 8/31/2010 9:41:17 AM | A | PASS |
|
|
Jim ###-####...scope of work was to add a new boiler and upsize meter to 2lb
|
MEC10-02291
| Final | 8/31/2010 | 8/31/2010 | | A | |
|
|
need to call Margie for a phone #.
|