Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-00815 FIRE-Final Inspection8/31/20118/31/20118/31/2011 3:36:09 PMPPASS
life safety passed
FIR11-00376 INSP-Final Inspection8/31/20118/31/20118/31/2011 3:18:42 PMPPASS
Permit finaled. The hood suppresson system functioned correctly.
FIR11-00376 INSP-Sprinkler Rough-in/Hydro8/31/20118/31/20118/31/2011 3:18:27 PMPPASS
Permit finaled. The hood suppresson system functioned correctly.
FIR11-00399 INSP-Conference8/31/20118/31/20118/31/2011 3:08:26 PMPDONE
Performed site visit to determine placement of heat detectors and found that the city approved plans do not show the heat detectors spaced for "sloped" ceilings, "High" ceilings or spacing taking "beam construction" into account. The plans also do not reflect the existing fire sprinkler riser which includes two interior tamper switches, an exterior wall PIV and a flow switch. After a discussion with plan review it was determined that a plan modification/resubmittal is needed to show this information. This was relayed to the fire alarm tech.
BLD11-00101 FIRE-Final Inspection8/30/20118/31/20118/31/2011 11:23:21 AMAPASS
life safety passed
FIR11-00427 INSP-Final Inspection8/30/20118/31/20118/31/2011 10:27:37 AMPPASS
permit finaled
BLD09-01976 FIRE-Final Inspection8/31/20118/31/20118/31/2011 10:23:38 AMPPASS
life safety passed
FIR11-00339 INSP-Final Inspection8/30/20118/31/20118/31/2011 8:56:09 AMAFAIL
Request final inspection. Please call Javier to schedule inspection time. Thanks. Phone #: ###-####

Call contact twice and went to job site and found no one waiting. No inspection performed.