Inspections for the day of: Wednesday, August 31, 2011.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00176 General Inspection8/31/20118/31/20119/1/2011 1:04:56 PM PASS
ESC11-00117 General Inspection8/31/20118/31/20118/31/2011 3:48:35 PM PART
Message to RP:
Extend the construction exit to a 50ft minimum length. Also stabilize all disturbed slopes on the project sooner than later to minimumize any erosion or sediment issues.
ESC09-00507 General Inspection8/31/20118/31/20118/31/2011 3:46:23 PM PART
Verbal to RP:
If no vertical construction is going to occur by October, they must stabilize all disturbed soil(Driveway) with an approved temporary or perminately stabilization method.
ESC10-00839 Aging Inspection8/31/20118/31/20118/31/2011 9:08:25 AM DONE
Permit finaled.
ESC10-00839 DOC - Permit Finaled8/31/20118/31/20118/31/2011 9:08:02 AMPPASS