PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, August 31, 2012
.
Number of inspections:
16
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Forrest France
Title
FIRE INSPECTOR
Phone #
794-1981
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
FIR12-00405
INSP-Final Inspection
8/30/2012
8/31/2012
9/4/2012 4:17:37 PM
A
FAIL
Noted eight locations where minimum distances to heat sources are not met per NFPA 13D 2010 table 7.5.5.3. Also noted mixed response types at one compartment in the lower level. Outside bell and flow test completed satisfactory.
BLD12-00550
FIRE-Final Inspection
8/30/2012
8/31/2012
8/31/2012 5:06:48 PM
P
NH
Peter Phone #: ###-####
FIR11-00650
INSP-Final Inspection
8/29/2012
8/31/2012
8/31/2012 4:52:48 PM
A
NR
Pending corrections.
FIR12-00469
INSP-Sprinkler Rough-in
8/30/2012
8/31/2012
8/31/2012 4:03:27 PM
P
PART
Okay to cover fire sprinkler work at the new entry vestibule and the womens restroom- see dated approved plan set annotations. Still need to verify insulation fill at the combustible concealed spaces- incomplete at this time.
BLD12-00764
FIRE-Final Inspection
8/31/2012
8/31/2012
8/31/2012 3:48:22 PM
P
FAIL
Missing fire code review notes on site, noted several missing exit signs and EM lights, door hardware needs revised at three locations, project is not in condition for final fire life safety approval at this time.
FIR12-00462
INSP-Final Inspection
8/30/2012
8/31/2012
8/31/2012 3:45:40 PM
P
FAIL
pat Phone #: ###-####
BLD11-01304
FIRE-Final Inspection
8/31/2012
8/31/2012
8/31/2012 2:22:56 PM
P
PASS
Scope of work completed. Life safety passed.
BLD12-00851
FIRE-Final Inspection
8/30/2012
8/31/2012
8/31/2012 2:21:37 PM
A
FAIL
Correction items include; adding missing exit sign shown per plan at the sales floor area, repair two non-functional exit signs, provide missing escutcheon, post PFE as discussed. Smoke evac test completed acceptable.
FIR03-00788
FIR-Aging Inspection
8/31/2012
8/31/2012
8/31/2012 2:17:15 PM
NR
FIR02-00268
FIR-Aging Inspection
8/31/2012
8/31/2012
8/31/2012 2:16:51 PM
DEFR
FIR03-00397
FIR-Aging Inspection
8/31/2012
8/31/2012
8/31/2012 2:16:29 PM
DEFR
FIR03-00411
FIR-Aging Inspection
8/31/2012
8/31/2012
8/31/2012 2:15:22 PM
DEFR
FIR03-00066
FIR-Aging Inspection
8/31/2012
8/31/2012
8/31/2012 2:14:53 PM
DEFR
FIR12-00247
INSP-Sprinkler Rough-in
8/30/2012
8/31/2012
8/31/2012 2:14:32 PM
A
PART
UG fire supply lines including the IBR's at buildings 5, 6, and 7 are approved for bury- see clouded annotations with today's date on stamped plan set. Note* supply pipe route changes matching field modifications are included on the overhead plan set.
FIR12-00480
INSP-Final Inspection
8/30/2012
8/31/2012
8/31/2012 2:09:32 PM
A
PASS
Hood suppression system operated correctly under test conditions. Permit finaled.
BLD11-01271
FIRE-Final Inspection
8/30/2012
8/31/2012
8/31/2012 2:08:23 PM
A
PASS
Fire life safety inspection passed. Contractor to post max. occupant load signage per plan as discussed. PFE's posted where indicated.