ELE11-01932
| ELE-Aging Inspection | 8/31/2015 | 8/31/2015 | 9/1/2015 1:57:51 PM | | DONE |
|
|
still waiting for Steve to get us access
|
ELE10-01426
| ELE-Aging Inspection | 8/31/2015 | 8/31/2015 | 9/1/2015 1:56:47 PM | | DONE |
|
|
still waiting for gas meter to be moved
|
GCE15-00020
| GCE-Final | 8/31/2015 | 8/31/2015 | 8/31/2015 2:11:31 PM | P | PASS |
|
|
Chris ###-#### - requested 2p.m. insp. final ok
|
ELE15-02757
| Final | 8/31/2015 | 8/31/2015 | 8/31/2015 1:37:31 PM | P | PASS |
|
|
Call Clinton if you have any questions - Phone #: ###-#### Inspection requested via web by allstate electric p/s ok- already hooked back up over the weekend. final ok
|
ELE15-02756
| Final | 8/31/2015 | 8/31/2015 | 8/31/2015 1:35:58 PM | P | PASS |
|
|
Call Clinton for any questions Phone #: ###-#### Inspection requested via web by allstate electric perm. service ok -already hooked up on weekend final ok
|
ELE15-01348
| Conference | 8/28/2015 | 8/31/2015 | 8/31/2015 1:14:17 PM | P | CANC |
|
|
Article 376, wireways. Capacity, derating conductors Phone #: ###-#### Inspection requested via web by Tom Betty re schedule for am conf. Could'nt reach Tom
|
ELE15-01348
| Electrical Rough-In | 8/28/2015 | 8/31/2015 | 8/31/2015 1:12:01 PM | P | PASS |
|
|
SHQ Lvl 5 Zone 2 in slab inspection Phone #: ###-#### Inspection requested via web by Tom Betty level 5 zone 2 slab on deck ok to pour
|
ELE15-02163
| Final | 8/31/2015 | 8/31/2015 | 8/31/2015 12:36:07 PM | P | NH |
|
|
Phone #: ###-#### Inspection requested via web by Dan Rohl no access to inside. Re arrange breakers in all in one to satisfy manufacturers info
|
ELE13-01696
| Final | 8/31/2015 | 8/31/2015 | 8/31/2015 11:24:57 AM | P | PASS |
|
|
Multiple wall signs and individual tenant under canopy sign. All primary electrical by others Phone #: ###-#### Inspection requested via web by Ken Olsen all cantelever signs and canopy signs final ok
|
ELE13-01291
| Electrical Rough-In | 8/31/2015 | 8/31/2015 | 8/31/2015 11:11:58 AM | A | PASS |
|
|
Contact Brandon Robinson to review and sign temporary occupancy. Phone #: ###-#### Inspection requested via web by Tom Betty temporary occupancy ok 1st floor parking garage barricaded area ONLY up to 6th floor. Zach with Hoffman states they will barricade all areas at Myrtle Street entrance area still under construction prior to "temp. occup. ok" with Fire and Building inspectors
|
GCE15-00137
| GCE-Temporary Service | 8/28/2015 | 8/31/2015 | 8/31/2015 9:39:12 AM | A | PASS |
|
|
Alan ###-#### t/s u/g n ok
|
ELE15-02599
| Conference | 8/28/2015 | 8/31/2015 | 8/31/2015 9:20:22 AM | A | DONE |
|
|
Mitch Phone #: ###-#### The entire electrical system shall be inspected and or tested by an electrical contractor after being compramised by utility line falling onto building. All damaged wiring, devices , light fixtures and electrical service shall be replacd and have an electrical rough in inspection prior to covering.
|
ELE15-02606
| Conference | 8/28/2015 | 8/31/2015 | 8/31/2015 9:13:34 AM | A | DONE |
|
|
Mitch Phone #: ###-#### The entire electrical system shall be inspected and or tested by an electrical contractor after being compramised by utility line falling onto building. All damaged wiring, devices, light fixtures and electrical service shall be replaced and have an electrical rough in inspection prior to covering.
|
ELE15-02607
| Conference | 8/28/2015 | 8/31/2015 | 8/31/2015 9:05:30 AM | A | DONE |
|
|
Mitch Phone #: ###-####The entire electrical system shall be inspected and or tested by an electrical contractor after being compramised by utility line falling onto building. All damaged wiring, devices, light fixtures and electrical service shall be replaced and have an electrical rough in inspection prior to covering.
|
ELE15-02605
| Conference | 8/28/2015 | 8/31/2015 | 8/31/2015 8:56:31 AM | A | DONE |
|
|
Mitch Phone #: ###-#### The entire electrical system shall be inspected and or tested by an electrical contractor after being compramised by utility line falling onto building. All damaged wiring shall be replaced and have a rough in inpection by the City of Boise prior to covering. All damaged devices and light fixtures shall be replaced also prior to final inspection. New electrical service already installed and ok to energize on this unit only.
|