ESC14-00892
| General Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 4:20:44 PM | | PASS |
|
|
All townhomes in Bella Vista have been framed. WIP on the east 7 homes, whiles the 7 homes on the west are very near completion. Trash and materials have been recently cleaned. No vdischarges or spills observed. No corrections issued.
|
ESC15-00927
| Site Preparation | 8/31/2015 | 8/31/2015 | 8/31/2015 2:49:07 PM | P | PASS |
|
|
BMPs installed, permit sign posted. No excavation started. Approved for construction.
|
ESC15-00929
| Site Preparation | 8/31/2015 | 8/31/2015 | 8/31/2015 2:11:48 PM | P | PASS |
|
|
Inspection requested via web by Erby Gonzales
Permit signs posted in Park Place. BMPs installed include DI bags and concrete washout bin. Trash and materials for active projects are contained. Chain link fence installed around perimeter to control access and contain wind blown debris from construction activity. Approved.
|
ESC15-00964
| Site Preparation | 8/31/2015 | 8/31/2015 | 8/31/2015 2:11:20 PM | P | PASS |
|
|
Inspection requested via web by Erby Gonzales
Permit signs posted in Park Place. BMPs installed include DI bags and concrete washout bin. Trash and materials for active projects are contained. Chain link fence installed around perimeter to control access and contain wind blown debris from construction activity. Approved.
|
ESC15-00966
| Site Preparation | 8/31/2015 | 8/31/2015 | 8/31/2015 2:10:38 PM | P | PASS |
|
|
Inspection requested via web by Erby Gonzales
Permit signs posted in Park Place. BMPs installed include DI bags and concrete washout bin. Trash and materials for active project are contained. Chain link fence installed around perimeter to control access and contain wind blown debris from construction activity. Approved.
|
ESC13-00259
| Aging Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 1:58:36 PM | | PEND |
|
|
All construction in Tripplett townhome subdivision is complete. All temporary BMPs have been removed except for the two DI bags on Triplett.
Request to remove inlet bags issued in order to Final permit.
|
ESC13-01279
| General Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 1:51:18 PM | | PART |
|
|
WIP at south end of Lucky Harris sub. Trash contained, clearing limits are being respected and perimeter BMPs installed. DI bags installed on all inlet. Projects have permit signs posted.
1 correction: - need to allow current washout to dry out and haul away. Install new washout for next round of homes. 5 new ones were just poured and washout was utilized..
|
ESC15-00954
| Site Preparation | 8/31/2015 | 8/31/2015 | 8/31/2015 1:37:26 PM | P | PASS |
|
|
Inspection requested via web by Erby Gonzales
Brighton Homes' SFHs in progress are currently in compliance. Permit sign posted, subdivision BMPs installed. Approved for excavation.
|
ESC14-00169
| Aging Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 12:24:37 PM | | PASS |
|
|
|
ESC13-00471
| Aging Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 11:41:28 AM | | PASS |
|
|
2 SFHs in progress at Tianna Park by Sunrise Homes. No trackout or discharges, inactive/complete areas have had DI bags removed. 1 bag installed on Spinnaker where work is. Workers keeping clean, no trash or litter issues.
Will request that gatorguard wattles in stand windows be removed. Approved.
|
ESC14-00588
| General Inspection | 8/28/2015 | 8/31/2015 | 8/31/2015 11:13:02 AM | A | PASS |
|
|
WIP on foundations and utility installations for apartment buildings in the District @ Parkcenter. No active dewatering at time of inspection. Irrigation ditch was rerouted from the former infiltration/holding pond (which is being drained and replaced per plans) and is flowing into Loggers Creek. There is no significant plume observed and water passes through silt fence barriers, check dames, undisturbed stream bank vegetation and straw wattle. I stated that the discharge should be monitored several times daily turbidity measurements taken when dewatering.
No trackout, construction entrance in operable condition. New wattles have been installed along the project frontage on Parkcenter inside chainlink fence. Fuel tank secondary containment is in good condtion; spill kit on site.
No corrections issued.
|
ESC14-00212
| General Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 10:20:37 AM | | PEND |
|
|
All construction complete. Residents have moved into Lusk Place for Fall semester. Large dumpster belongs to Vista Apartments.
Landscaping and hydroseeding is complete. Grass has started to grow well on the east and south of site. Area around Anniversary Inn culvert and DD3 outlet is completey stabile.
Request to McAlvain to remove DI bag on Lusk Street. RP-GC stated he will remove today. RP also stated that he will inform manager to warn students about litter. Lots of non-construction litter on Lusk street observed.
|
ESC39-00002
| Aging Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 9:42:31 AM | | CANC |
|
|
test case entry. not an active permit
|
ESC14-00653
| Aging Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 9:13:01 AM | | PASS |
|
|
|
ESC14-01139
| General Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 8:42:50 AM | | PASS |
|
|
WIP within storage yard. No sediment leaving site. No corrections issued.
|
ESC14-01138
| General Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 8:42:42 AM | | PASS |
|
|
WIP within storage yard. No sediment leaving site. No corrections issued.
|