ELE13-02418
| ELE-Aging Inspection | 8/31/2016 | 8/31/2016 | 9/2/2016 7:49:48 AM | | CANC |
|
|
too busy
|
ELE12-02398
| ELE-Aging Inspection | 8/31/2016 | 8/31/2016 | 9/2/2016 7:49:29 AM | | CANC |
|
|
too busy
|
ELE16-02693
| Electrical Rough-In | 8/31/2016 | 8/31/2016 | 8/31/2016 2:42:04 PM | P | PASS |
|
|
Call Chris for inspection of vault terminations and terminations at existing service disconnects. Phone #: ###-#### Inspection requested via web by Rafael Castillo Connections of extending wires feeding vault from main in down garage and connections OK. Ok to re-energize
|
ELE16-02693
| Permanent Service | 8/31/2016 | 8/31/2016 | 8/31/2016 2:41:43 PM | P | PASS |
|
|
Call Chris for inspection of vault terminations and terminations at existing service disconnects. Phone #: ###-#### Inspection requested via web by Rafael Castillo EC only re-fed from existing gear to vault, no modification to service was done it will be demo and redone by others. p/s u/g rec ok
|
ELE14-03316
| Electrical Rough-In | 8/31/2016 | 8/31/2016 | 8/31/2016 1:39:57 PM | P | PASS |
|
|
Garage EXP Locker RM ceilings Lighting cover Insp. RM # 108 ,136 Phone #: ###-#### Inspection requested via web by Tom Betty locker rooms hard lids and walls only ok cover
|
ELE15-01348
| Electrical Rough-In | 8/30/2016 | 8/31/2016 | 8/31/2016 1:39:24 PM | P | PASS |
|
|
Level 9 bathroom ceiling. Numerous elevator vestibule ceilings. levels 2-6 Headquarters. Call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson Level 9 bathrooms hard lids ok cover Levels 2,3,4,5 elevator vestibuls hard lids ok cover
|
ELE16-02730
| Electrical Rough-In | 8/30/2016 | 8/31/2016 | 8/31/2016 12:32:33 PM | P | PASS |
|
|
UG Phone #: ###-#### Inspection requested via web by Kerri Hamilton area north of main column underground ok cover
|
ELE16-02641
| Final | 8/31/2016 | 8/31/2016 | 8/31/2016 12:09:37 PM | P | PASS |
|
|
Mike Phone #: ###-#### final ok
|
ELE16-02417
| Electrical Rough-In | 8/31/2016 | 8/31/2016 | 8/31/2016 11:33:04 AM | P | PASS |
|
|
Mitch Phone #: ###-#### will need to verify common trip handles for multi wire branch circuits. Walls and ceilings ok cover
|
ELE16-02844
| Electrical Rough-In | 8/31/2016 | 8/31/2016 | 8/31/2016 11:18:26 AM | P | PASS |
|
|
Wall Insp. Phone #: ###-#### Inspection requested via web by John VanZandt walls only ok cover
|
ELE16-02849
| Electrical Rough-In | 8/31/2016 | 8/31/2016 | 8/31/2016 10:35:50 AM | P | PASS |
|
|
Unit 107 , 108, 109 Phone #: ###-#### Inspection requested via web by Kevin Burke units 107,108,109, ok cover, one wall between units will be double sheetrocked need to check for spark rings on each unit fire wall
|
ELE16-02450
| Final | 8/31/2016 | 8/31/2016 | 8/31/2016 10:17:22 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jamie berg final ok
|
ELE16-02534
| Rough-In Permanent Service | 8/30/2016 | 8/31/2016 | 8/31/2016 9:54:53 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Hidajet Zahic rough-in ok cover p/s u/g n ok
|
ELE16-02369
| Final | 8/31/2016 | 8/31/2016 | 8/31/2016 9:02:31 AM | A | PASS |
|
|
Call Dene with any questions Thank you Phone #: ###-#### Inspection requested via web by kim grundhauser final for landscape lighting ok
|
ELE16-02818
| Rough-In Permanent Service | 8/30/2016 | 8/31/2016 | 8/31/2016 8:39:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn rough-in ok cover p/s u/g n ok
|
ELE16-02841
| Rough-In Permanent Service | 8/30/2016 | 8/31/2016 | 8/31/2016 8:28:20 AM | A | PASS |
|
|
access 1122 Phone #: ###-#### Inspection requested via web by David Nelson areas damaged by fire entry,all upstairs,down bed,utility,garage ok cover
|
ELE16-02752
| Rough-In Permanent Service | 8/30/2016 | 8/31/2016 | 8/31/2016 8:28:20 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn rough-in ok cover p/s u/g n ok
|